- Product Details
- {{item.text}}
Quick Details
-
Voltage:
-
220/380v
-
Dimension(L*W*H):
-
1350*550*1500 mm
-
Weight:
-
30 KG
-
After-sales Service Provided:
-
Engineers available to service machinery overseas
-
Processing Capacity:
-
1-3t/h
-
Material:
-
Stainless Steel
-
Noise:
-
<85dB(A)
-
Pipe Material:
-
PVC tube
-
After sale service:
-
One Year
-
Installation:
-
Engineer Guide
-
Quality:
-
ISO 90012008 Standard
-
Application:
-
Gold
-
Product name:
-
Gold Mining Machine
Quick Details
-
Production Capacity:
-
>90%
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
KD
-
Voltage:
-
220/380v
-
Dimension(L*W*H):
-
1350*550*1500 mm
-
Weight:
-
30 KG
-
After-sales Service Provided:
-
Engineers available to service machinery overseas
-
Processing Capacity:
-
1-3t/h
-
Material:
-
Stainless Steel
-
Noise:
-
<85dB(A)
-
Pipe Material:
-
PVC tube
-
After sale service:
-
One Year
-
Installation:
-
Engineer Guide
-
Quality:
-
ISO 90012008 Standard
-
Application:
-
Gold
-
Product name:
-
Gold Mining Machine
Keda Supply Alluvial Gold Dry Blower Gold Mining Equipment Price
Features
1. It works by wind power and is widely used in non-water and desert area.
2. Easy to operate. 1-2 persons are needed. Save labor force.
3. Less fuel consumption and save cost.
4. It is portable, convenient to transport and assemble.
Basic Parameter
Model |
KD-1.3D |
KD-2.6D |
KD-4.8D |
Dimension(mm) |
1350*550*1500 |
1800*750*1600 |
2400*750*1600 |
Power |
Centrifugal blower |
Centrifugal blower |
Centrifugal blower |
Centrifugal blower model |
KD-1.5 |
KD-3 |
KD-5.5 |
Noise |
<85dB(A) |
<87dB(A) |
<89dB(A) |
Weight(Kg) |
30/32.2 |
48 |
79 |
Blower capacity |
2000m³/h |
4120m³/h |
5847m³/h |
Pipe material |
PVC tube |
PVC tube |
PVC tube |
Box material |
stainless steel |
stainless steel |
stainless steel |
Working capacity |
1-3t/h |
2-6t/h |
4-8t/h |
Customers' Visting
1.Customers' mining project consult will be provided by our experienced engineers and technicist.
2.According to customers' request the testing sample in laboratory will be available all the time.
3.We always providing whole production line equipments and spare parts with the best price.
4.We will dispatch engineer overseas to guide for equipment installation and debugging if needed.
5.We will train customers' local first batch workers and make them operate expertly if needed.
6.We will help solve the problems on the equipment operation by electronic tools or to the site.