1. Our COMPANY supports the client to pay by instalments.
2. All of accessories will be prepared at seller’s factory, the body of the production line can be bought from local market in order to cut client’s cost. It will take 90 days to prepare all accessories for the production line.
3. When all of parts have delivered to the client’s factory, we will arrange 2~3 engineers to guide the installation, there are of the 5-6 experienced mechanical workers from client’s side to help the installation. After finishing installation, 2 training engineers will take charge of workers’ train. The whole of process will spend 60 days on installation and train.
2022 Nitrile latex examination glove making machine production line
The nitrile/latex glove production line uses natural latex or synthetic rubber as the main raw material and other chemicals as auxiliary materials. The hand mold is cleaned with acid and alkali, and then cleaned with water again. Then the cleaned hand mold is first immersed in hot water and heated then immersed into coagulant and dried for dipping. After dipping, go into an oven for preliminary drying, flushed with hot water and then sent to another oven for curing and drying to form. After the gloves are demolded, they are inflated or filled with water for inspection, washed.centrifuged. and dried before packaging and sending them to the finished product warehouse.
- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
DEYI
-
Power:
-
90KW
-
Dimension(L*W*H):
-
Customizable
-
Weight:
-
200000
-
Function:
-
Nitrile gloves making, condom making
-
Suitable raw material:
-
Nitrile, latex
-
Glove Type:
-
Surgical
-
Color:
-
customizable
-
speed:
-
customizable
-
Product:
-
gloves
-
Feature:
-
Easy Operation
Quick Details
-
Production Capacity:
-
4000-35000pcs/h
-
Voltage:
-
220V-380V
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
DEYI
-
Power:
-
90KW
-
Dimension(L*W*H):
-
Customizable
-
Weight:
-
200000
-
Function:
-
Nitrile gloves making, condom making
-
Suitable raw material:
-
Nitrile, latex
-
Glove Type:
-
Surgical
-
Color:
-
customizable
-
speed:
-
customizable
-
Product:
-
gloves
-
Feature:
-
Easy Operation
Product Description
PRODUCT SPECIFICATIONS
TYPE
|
Hand mold
|
Capacity(pieces/hr)
|
Size
|
Power
|
Latex Consumption
|
DY45
|
single
|
2400-3000
|
45x1.8x7m
|
About 75kw/h
|
About 0.7tons/day
|
DY50
|
single
|
3000-3600
|
50x1.8x8m
|
About 80 kw/h
|
About 0.8tons/day
|
DY80
|
single
|
8100-8500
|
80x1.8x8m
|
About 90 kw/h
|
About 1.8 tons/day
|
DY100
|
single
|
9600-10200
|
100x1.8x8m
|
About 120 kw/h
|
About 2.5 tons/day
|
DY110
|
single
|
29000-30500
|
110x1.8x12m
|
About 150 kw/h
|
About 6.6 tons/day
|
DY120
|
double
|
19000-21000
|
120x1.8x11m
|
About 120 kw/h
|
About 4.4 tons/day
|
DY140
|
double
|
15500-16500
|
140x1.8x8m
|
About 120 kw/h
|
About 3.5 tons/day
|
DY180
|
double
|
35000-40000
|
180x1.8x12m
|
About 150 kw/h
|
About 8.2 tons/day
|

Gipping

Load material

Production line
The nitrile/latex glove production line uses natural latex or synthetic rubber as the main raw material and other chemicals as auxiliary materials. The hand mold is cleaned with acid and alkali, and then cleaned with water again. Then the cleaned hand mold is first immersed in hot water and heated then immersed into coagulant and dried for dipping. After dipping, go into an oven for preliminary drying, flushed with hot water and then sent to another oven for curing and drying to form. After the gloves are demolded, they are inflated or filled with water for inspection, washed.centrifuged. and dried before packaging and sending them to the finished product warehouse.
Machine install
Raw materials tank
Nitrile
Hand Mold
Chain
Manufacturing Technique

Installation For Customer
Procurement process
ORDER
To make contact
→Engineer confirms the size of customer's workshop→Desing plant layout plan
→Design product line drawings and confirm by both parties
→Buy steel, manufacture tank, tank and other parts for production line
→Shipment to customer plant
→The engineer came to the factory to guide the installation
→Commissioned finished product
→Design product line drawings and confirm by both parties
→Buy steel, manufacture tank, tank and other parts for production line
→Shipment to customer plant
→The engineer came to the factory to guide the installation
→Commissioned finished product
Our Advantage
Packaging and shipping
FAQ
Hot Searches