- Product Details
- {{item.text}}
Quick Details
-
Dimension(L*W*H):
-
5.0*2.0*2.7m
-
Product Name:
-
Easy move highway guardrail post pile driver
-
Rated Power:
-
40KW
-
Power Head:
-
68#
-
Pile Diameter:
-
0-250mm
-
Pile Max Diatmeter:
-
50-260mm
-
Pile Max Height:
-
2800mm
-
Drilling depth:
-
2500mm
-
Color:
-
customized
-
Keywords:
-
Pilling Machine
-
Usage:
-
Highway Guardrail Install
Quick Details
-
Place of Origin:
-
China
-
Brand Name:
-
HW
-
Weight:
-
4.2 kg
-
Dimension(L*W*H):
-
5.0*2.0*2.7m
-
Product Name:
-
Easy move highway guardrail post pile driver
-
Rated Power:
-
40KW
-
Power Head:
-
68#
-
Pile Diameter:
-
0-250mm
-
Pile Max Diatmeter:
-
50-260mm
-
Pile Max Height:
-
2800mm
-
Drilling depth:
-
2500mm
-
Color:
-
customized
-
Keywords:
-
Pilling Machine
-
Usage:
-
Highway Guardrail Install
Product Description
Hydraulic excavator mounted vibratory hammer sheet piling driver
The guardrail pile driver is a kind of highway guardrail steel pipe pile pressing equipment. It adopts diesel power and full hydraulic mechanical transmission. It has the characteristics of light driving, high piling precision, durability, energy saving and environmental protection. It is especially suitable for highway guardrail installation, maintenance and Field repair construction for repairs. Functions: piling, drilling, piling
Pneumatic pile driver usage:Hydraulic Diesel Vibratory Mini Pile Driver
1, highway guardrail drilling, piling, piling
2. Piling in other fields (such as farms, ranches, orchards, etc.)
3. Highway field constructionHydraulic Diesel Vibratory Mini Pile Driver
Power configuration: reasonable power, superior performance of the diesel engine, for the construction work provides a powerful source of power, power reliability, fuel economy, has been greatly improved.
Hydraulic system: advanced hydraulic system, high quality hydraulic components strict assembly process, ensure the high efficiency and durability of the hydraulic system. Modeling design: the overall frame structure is excellent, the material is completely national standard.High strength, good
stability, in line with the industrial aesthetic design ideas, operators more spacious workspace.Hydraulic Diesel Vibratory Mini Pile Driver Production process: the production process is more reasonable, wear - resistant parts are using heat treatment process.Rigorous
welding process, frame welding of the overall stress treatment, reduce deformation, detection equipment is perfect. SPECIFICATIONS FOR Hydraulic Diesel Vibratory Mini Pile Driver
1, highway guardrail drilling, piling, piling
2. Piling in other fields (such as farms, ranches, orchards, etc.)
3. Highway field constructionHydraulic Diesel Vibratory Mini Pile Driver
Power configuration: reasonable power, superior performance of the diesel engine, for the construction work provides a powerful source of power, power reliability, fuel economy, has been greatly improved.
Hydraulic system: advanced hydraulic system, high quality hydraulic components strict assembly process, ensure the high efficiency and durability of the hydraulic system. Modeling design: the overall frame structure is excellent, the material is completely national standard.High strength, good
stability, in line with the industrial aesthetic design ideas, operators more spacious workspace.Hydraulic Diesel Vibratory Mini Pile Driver Production process: the production process is more reasonable, wear - resistant parts are using heat treatment process.Rigorous
welding process, frame welding of the overall stress treatment, reduce deformation, detection equipment is perfect. SPECIFICATIONS FOR Hydraulic Diesel Vibratory Mini Pile Driver
Technical Parameter
SPECIFICATIONS FOR Hydraulic Diesel Vibratory Mini Pile Driver
|
|
|
Model
|
HW930
|
|
Rated Power
|
40KW
|
|
Power Head
|
68#
|
|
Pile Diameter
|
0-250mm
|
|
Pile Max Diatmeter
|
50-260mm
|
|
Pile Max Height
|
2800mm
|
|
Drilling depth
|
2500mm
|
|
Overall Dimension
|
5.0*2.0*2.7m
|
|
Machine Weight
|
4.2T
|
Detailed Images
Company Introduction
Shandong Hengwang Group Co., Ltd is a subsidiary of Shandong Hengwang GroupCo.,Ltd, is located in Jining, Shandong Province,China.Established in 2002, comprehensive en-terprise, collection of marketing, scientific research, trade. Registered capital of 10.8 million, Exist-ing staff 200 persons, including 3 engineering experts, senior software engineer 8 persons, net-work information
technicians 28 persons, E-commerce division, more than 80 persons, the interna-tional trade commissioner, 18 persons, logistics division 9 persons, all kinds of technical personnelmore than 50 persons. Specializing in the Drilling equipment and pile driver.Our products sell toVietnam, Afghanistan, South Korea and other southeast Asia, Africa and the Middle East, SouthAmerica, North America, Europe etc, is popular among the masses of customers.
technicians 28 persons, E-commerce division, more than 80 persons, the interna-tional trade commissioner, 18 persons, logistics division 9 persons, all kinds of technical personnelmore than 50 persons. Specializing in the Drilling equipment and pile driver.Our products sell toVietnam, Afghanistan, South Korea and other southeast Asia, Africa and the Middle East, SouthAmerica, North America, Europe etc, is popular among the masses of customers.
FAQ
Q1.What is the main function of our pile driver?
Ans.: It has different models used for all kinds of PV post install, it is the best choice forsolar power station construction.
Q2. What is your terms of payment?
Ans.: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and
packages before you pay the balance.
Q3. What is your terms of delivery?
Ans.: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
Ans.: Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
Q5. What is the warranty of our machine?
Ans.:Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.
Q6. What is your terms of packing?
Ans.: It has different models used for all kinds of PV post install, it is the best choice forsolar power station construction.
Q2. What is your terms of payment?
Ans.: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and
packages before you pay the balance.
Q3. What is your terms of delivery?
Ans.: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
Ans.: Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
Q5. What is the warranty of our machine?
Ans.:Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.
Q6. What is your terms of packing?
Related Products
Hot Searches