- Product Details
- {{item.text}}
Quick Details
-
Dimension(L*W*H):
-
9000x2500x3500mm
-
Weight:
-
2500 KG
-
Place of Origin:
-
Shanghai, China
-
Voltage:
-
380V, can be customized
-
Power:
-
34kw
-
Key Machines:
-
cleaning machine, sterilizer, bag packing machine
-
Product Type:
-
tomato paste, tomato puree
-
Material:
-
304 Stainless Steel
-
Application:
-
Fruit Vegetable
-
Function:
-
Tomato Paste Processing
-
Product name:
-
tomato paste machine
Quick Details
-
Machinery Capacity:
-
100kg/h-15tons/h
-
Brand Name:
-
KFD
-
Year:
-
2022
-
Dimension(L*W*H):
-
9000x2500x3500mm
-
Weight:
-
2500 KG
-
Place of Origin:
-
Shanghai, China
-
Voltage:
-
380V, can be customized
-
Power:
-
34kw
-
Key Machines:
-
cleaning machine, sterilizer, bag packing machine
-
Product Type:
-
tomato paste, tomato puree
-
Material:
-
304 Stainless Steel
-
Application:
-
Fruit Vegetable
-
Function:
-
Tomato Paste Processing
-
Product name:
-
tomato paste machine
1. Introduction of our company
Shanghai Keyfood Machinery Co., Ltd is a high-tech company specialized in fruit and vegetable processing machines as well as the whole production line for paste, such as tomato paste, pepper paste etc. From the beginning of raw fruits washing, lifting, selecting, crushing, peeling, coring, pulping etc, to various vacuum concentrations, UHT sterilization, KEYFOOD MACHINE can provide whole solution for either BID (bag in drum) packaging or plastic bags etc.
With the operation concept of "Professionalism, Sincerity and Trustworthiness", our company has been devoted to providing world-class products and service. Through years of development, we have constantly enhanced our group and innovation, sparing no efforts to provide sincere and excellent service, all of which have helped us gain the markets in Europe, the Middle East and Southeast Asia. We have won a high reputation among clients.
With the operation concept of "Professionalism, Sincerity and Trustworthiness", our company has been devoted to providing world-class products and service. Through years of development, we have constantly enhanced our group and innovation, sparing no efforts to provide sincere and excellent service, all of which have helped us gain the markets in Europe, the Middle East and Southeast Asia. We have won a high reputation among clients.
2.
Process flow chart of tomato paste production line:
3. Production Performances
Raw Material
|
Fresh tomato
|
End Product
|
Tomato Paste
|
Harvest Season
|
To be confirmed
|
Fruit Consistence
|
4.5 Brix
|
Product Consistence
|
Hot break 28 to 30 Brix
|
Processing Capacity
|
30 tons per hour, with 12 working hours a day
|
End Package
|
Aseptic bag in drums
|
Evaporating temperature
|
First step : 65℃; Second step: 48℃
|
4. Supporting Facilities
1. Re-circulating cooling water dosage: 820 tons per hour( inlet temperature: no higher than 30℃)
2. Source of the Re-circulating cooling water: running water
3. Steam consumption: 15 tons per hour (90 ℃)
4. d. Water drainage facility: the workshop should be equipped with enough floor drain device
5. Total power consumption: 150 KW
6. Power supply: three phase 380 V 50 HZ ( can be customized)
1. Re-circulating cooling water dosage: 820 tons per hour( inlet temperature: no higher than 30℃)
2. Source of the Re-circulating cooling water: running water
3. Steam consumption: 15 tons per hour (90 ℃)
4. d. Water drainage facility: the workshop should be equipped with enough floor drain device
5. Total power consumption: 150 KW
6. Power supply: three phase 380 V 50 HZ ( can be customized)
5. Specifications for different capacity
6. Factory overview
Package and shipment
All the machines are packaged in export wooden cases and loaded in containers.
All the machines are packaged in export wooden cases and loaded in containers.
After-sales service and warranty period
We provide overseas installation and testing service. The buyer should be responsible for round trip air tickets cost, local
accommodations, visa transaction cost, local transportation and pay US$80/day/person for the engineer cost. The warranty period is
12months after the installation and running in the buyer's factory
We provide overseas installation and testing service. The buyer should be responsible for round trip air tickets cost, local
accommodations, visa transaction cost, local transportation and pay US$80/day/person for the engineer cost. The warranty period is
12months after the installation and running in the buyer's factory
Hot Searches