- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
Non-standard
-
Product name:
-
silicone rubber foam weather sponge seals strip
-
Keyword:
-
foam weather sponge seals strip
-
Certification:
-
ISO9001 LFGB ROHS EN71/35 patent certificates
-
Size:
-
Any Size/According to the drawing Custom
-
hardness:
-
30~90 ShoreA
-
Application:
-
car, door, window, construction industry
-
Color:
-
Custom Color
-
OEM/ODM:
-
Welocme
-
Feature:
-
Resistant to corrosion aging abrasion
-
Material:
-
silicone rubber nbr epdm pvc pu,etc
Quick Details
-
Processing Service:
-
Supplant
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
YICHI
-
Model Number:
-
Non-standard
-
Product name:
-
silicone rubber foam weather sponge seals strip
-
Keyword:
-
foam weather sponge seals strip
-
Certification:
-
ISO9001 LFGB ROHS EN71/35 patent certificates
-
Size:
-
Any Size/According to the drawing Custom
-
hardness:
-
30~90 ShoreA
-
Application:
-
car, door, window, construction industry
-
Color:
-
Custom Color
-
OEM/ODM:
-
Welocme
-
Feature:
-
Resistant to corrosion aging abrasion
-
Material:
-
silicone rubber nbr epdm pvc pu,etc
Specification
Product Name
|
Custom Door Window sealing strips
|
Material
|
Rubber (NBR, EPDM, CR, FRM, NR, Silicone) NBR+/PVC, NBR+/PVC+CSM, EPDM+FIBER+EPDM, FKM+ECO, FKM/ECO+FIBER+ECO, All Foam Rubber.
|
Mold Material
|
No. 50 steel, No. 45 steel, P20, H13 etc.
|
Mold Precision
|
If no special request, apply to ISO3302:2014 standards, class 3.
|
Drawing Format
|
.stp / .step / .igs /.stl /.dwg / .pdf
|
Size
|
Any Size / According to customer size or drawing
|
Color
|
Almost all PMS colors available for Silicone (VMQ); Mostly black for other rubber materials, if other colors are required, please
indicate it on inquiry. |
Parameters
|
Inch, centimeter, millimeter, etc.
|
Function
|
Industrial parts /Building /Automotive /Mall /Machinery /Medical grade supply.
|
Package
|
Pack in bulk / Pack in roll/ Poly bag / bubble bag / color box/ Pallet / Wooden Box.
|
Certificate
|
ISO ROHS LFGB EN71/35 Patent Certificates
|
Delivery time
|
A: Standard parts inventory 3Day
B: The product is out of stock, and the mold is also in stock. Delivery time is 7 days.
C: The product is out of stock, the mold is out of stock, and the lead time is 15 days.
|
After-sales service
|
Unreasonable return for product quality problems
|
Testing Equipment
About us
FAQ
Q1:
What kind of payment methods do you accept?
A1: We accept T/T 30% advance payment and 70% final payment. B/L or L/C Spot, West
Union remittance, VISA, Paypal.
Q2:
How do we guarantee the quality?
A1: Product certificate: SGS inspection LFGB ROHS EN71 ISO:9001-ISO:14001 / won
Obtained 35 patent certificates
A2: Three inspection procedures, confirm the sample with the customer before mass production, and start the production after confirmation
Large-scale production (support third-party testing)
Q3:
What guarantee service do we provide?
A1: More than 5,000 sets of standard parts molds, complete in size, directly on the machine to produce, shorten the customer’s delivery
Exemption of mold fee for delivery time.
A2: Non-standard customized parts, one-time mold opening for life-long use, if the mold is damaged, free renewal
Mold. The mold fee will be refunded when the purchased quantity is reached.
Q4:
Why should you buy from us?
A1: The company specializes in R&D and production of rubber, silicone, and fluorine rubber sealing products.
A2: It has a CNC machine workshop (10 sets), a vulcanizing machine workshop (32), two shifts per day for 16 hours
Time production. Ensure the mass supply of customers.
Complete product specifications have passed ISO9001 quality system certification.
Q5:
Is the size of the standard parts complete?
A1: We have a warehouse of nearly 2,000 square meters, and 85% of the standard parts are sealed. Size and materials
All, can be shipped within 3 days, there is no MOQ.
Q6:
Can my product be used in a special environment?
A1: For some harsh environments, we have a complete material supply chain and laboratories,
Special raw materials can be deployed according to requirements.
Q7:
How long is the delivery time?
A1: Standard parts inventory products, the delivery time is 3 days.
A2: Standard parts are out of stock, and molds are in stock. If necessary, the lead time for samples is 7 days. Bulk goods
Determine the specific delivery time according to the quantity
A3: Customized products are out of stock, molds are out of stock, and the sample lead time is 12 days. Bulk goods according to production
Product type, quantity determines delivery time
Q8:
What kind of logistics method is used?
A1: Express, air, sea. based on customer's needs
A2: Years of logistics cooperation links can choose the most cost-effective logistics provider in different countries
Mode.
Hot Searches