- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
WFS
-
Power:
-
0.75KW
-
Weight (KG):
-
3000 kg
-
Voltage:
-
380v/220v
-
Advantage:
-
Low Noise Low Loss
-
Color:
-
Customized
-
Capacity:
-
200-5000 kg/day
-
Fuel:
-
Natural Gas/diesel Oil /LPG
-
Certification:
-
CE ISO
Quick Details
-
Production Capacity:
-
750L/H
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
BETTER
-
Model Number:
-
WFS
-
Power:
-
0.75KW
-
Weight (KG):
-
3000 kg
-
Voltage:
-
380v/220v
-
Advantage:
-
Low Noise Low Loss
-
Color:
-
Customized
-
Capacity:
-
200-5000 kg/day
-
Fuel:
-
Natural Gas/diesel Oil /LPG
-
Certification:
-
CE ISO
Product Description
Waste solutions for
1. Mining/ exploration camp waste
2. Small community waste control
3. E-waste disposal
4. Cannabis waste
5. Controlled drug destruction
6. Invasive plant species control
7. Marine waste management
8. Refugee camp waste
9. Waste management
2. Small community waste control
3. E-waste disposal
4. Cannabis waste
5. Controlled drug destruction
6. Invasive plant species control
7. Marine waste management
8. Refugee camp waste
9. Waste management
Specification
Model
|
WFS-30
|
WFS-50
|
WFS-150
|
WFS-300
|
WFS-500
|
Burning capacity
|
200-300kg/day
|
300-500kg/day
|
500-1200kg/day
|
1500-3000kg/day
|
300-400kg/day
|
Size m (L*H*B)
|
1.45*0.9*1.75
|
1.8*1.15*3
|
2*1.4*3.5
|
2.2*1.4*3.8
|
3*2*4.8
|
Imputing width (mm)
|
480*600
|
620*800
|
760*960
|
900*1100
|
1080*1280
|
Chimney diameter (mm)
|
280
|
280
|
300
|
400
|
460
|
draught fan
|
0.25w
|
0.25w
|
0.37w
|
0.55kw
|
0.55kw
|
Combustion device
|
0.12kw
Oil consumption: 4-6kg/h
|
0.12kw
Oil consumption: 4-10kg/h
|
0.18kw
Oil consumption: 4-10kg/h
|
0.18kw
Oil consumption: 7-14kg/h
|
0.25kw
Oil consumption:
7-14kg/h
|
Re-burning device
|
0.18kw
Oil consumption 4-6 kg/h
|
0.18kw
Oil consumption: 4-10kg/h
|
0.25kw
Oil consumption: 7-14kg/h
|
0.25kw
Oil consumption: 10-20kg/h
|
0.25kw
Oil consumption:
15-26kg/h
|
Voltage
|
380v/220v
|
380v/220v
|
380v/220v
|
380v/220v
|
380v/220v
|
Weight(kg)
|
2300
|
4000
|
7000
|
8000
|
13000
|
If you have a specialist project - then speak to us about our bespoke incinerator designs for solid waste & waste treatment solutions.
Basic processing of
recycling
E waste /
pcb scrap
Preparation of waste stream – most waste streams will require some pre-preparation. In the long-term
this can have a huge impact on the savings you can make.
1. Sort – remove any high value recyclable items for resale.
2. Shred – normalise the particle size and add air to mix
3. Dry – we suggest max of 30% moisture to ensure best efficiency
4. Determine batch size – establish the optimum batch size based on volume you can burn for lowest cost in lowest time.
5. De-ash – once chamber has cooled you can easily de-ash the system ready for the next batch.
6. Spot check – ensure chamber, burners and fuel lines are all in good condition
7. Re-load – load chamber for next operation
Packing & Delivery
Company introduction
Where are our incinerators are being used?
You will see our range of medical incinerators located in hospitals and health clinics across the globe.
We have installations from Southeast Asia to the Middle East. Most recently we have built and supplied hundreds of medical incinerators to the Africa for use in hospitals.
Why choose a Clinical Incinerator from our company?
we have provided solutions to health centers and health clinics around the globe for years - because our experience and skills in this sector are second to none.
BETTER manufactures incinerator for a number of different industries, and we specialize in designing reliable incinerator for the hospital, food, energy and marine industries. Our trained engineers have many years of experience, thus we are able to offer custom-made incinerators for a wide variety of sectors with very different needs.
Where are our incinerators are being used?
You will see our range of medical incinerators located in hospitals and health clinics across the globe.
We have installations from Southeast Asia to the Middle East. Most recently we have built and supplied hundreds of medical incinerators to the Africa for use in hospitals.
Why choose a Clinical Incinerator from our company?
we have provided solutions to health centers and health clinics around the globe for years - because our experience and skills in this sector are second to none.
Company Profie
FAQ
We are more than happy to help you with any inquiry. Call us or send us an email, and we’ll be ready to assist you.
1.Product warranty: Usually, our product warranty is 18 months after leaving factory or 12 months after installation.
2.Delivery time: It will depend on the product quantity. Our products are sold according to order.
3.Installation: If the project needs our installation guidance, we can send our engineer and translator. The expenses shall be borne by the project owner.
4.Terms of payment: L/C or T/T.
5.About the sample: we can give you delivery, you need to pay for this cost.
1.Product warranty: Usually, our product warranty is 18 months after leaving factory or 12 months after installation.
2.Delivery time: It will depend on the product quantity. Our products are sold according to order.
3.Installation: If the project needs our installation guidance, we can send our engineer and translator. The expenses shall be borne by the project owner.
4.Terms of payment: L/C or T/T.
5.About the sample: we can give you delivery, you need to pay for this cost.
Hot Searches