- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
DS1054Z
-
Product Name:
-
DS1054Z
-
Channels:
-
4
-
Weight:
-
3.8 kg ± 0.5 kg
-
Size:
-
313.1 mm*160.8 mm*122.4 mm
Quick Details
-
Type:
-
Handheld Oscilloscope
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
RIGOL
-
Model Number:
-
DS1054Z
-
Product Name:
-
DS1054Z
-
Channels:
-
4
-
Weight:
-
3.8 kg ± 0.5 kg
-
Size:
-
313.1 mm*160.8 mm*122.4 mm
Specification :
BW 50MHz
Max. Sample rate 1GSa/s (single-channel)
500MSa/s(dual-channel)
250MSa/s(four-channel)
Max. Memory Depth 12Mpts(standard,1CH) ,24Mpts(option,1CH)
Max. Waveform Capture rate 30,000 wfms/s
Channels 4
Trigger functions Edge,Pulse width,slope,video,pattern,Runt,Windows,Nth Edge,Delay,Time Out,Duration,setup/hold,RS232/UART,I2C,SPI
Series Bus Decording RS232/UART,I2C,SPI
Math functions A+B, A-B, A×B, A/B, FFT, &&, ||, ^, !, intg, diff, sqrt, lg, ln, exp, abs
Auto Measurements Maximum, Minimum, Peak-Peak Value, Top Value, Bottom Value, Amplitude, Average, Mean Square Root, Overshoot, Pre-shoot, Area, Period Area, Frequency, Period, Rise Time, Fall Time, Positive Pulse Width, Negative Pulse Width, Positive Duty Cycle, Negative Duty Cycle, Delay A→B rising edge, Delay A→B falling edge,Phase A→B rising edge,Phase A→B falling edge
Input R (1MΩ±2%)||(13 pF±3 pF)
Display 7.0 inches TFT LCD display,800 horizontal×RGB×480 vertical pixel
BW Limit 20MHz
Connectivities USB HOST, USB DEVICE, LAN, Aux (TrigOut /PassFail)
Size(W×H×D) 313.1 mm× 160.8 mm×122.4 mm
Weight 3.8 kg ± 0.5 kg
Built in Source NA
Channels | Weight |
4 | 3.8 kg ± 0.5 kg |
Package: Normally we use the standard exporting packaging. We also can according to clients' request .
Shipping :
1. By Couriers: DHL, UPS, FEDEX, TNT are the main courier we are co-operating at present.
2. By Air: Delivery from the Shenzhen airport to customers’ destination city air port.
3. By Sea: Delivery from the shenzhen sea port
1. The questions about the encoder will be answered within 24 hours.
2. One-stop solution will offer to meet all your requirements on budget, designing and shipment.
3. Update the procession of manufacturing