- Product Details
- {{item.text}}
Quick Details
-
Dimension:
-
194*109*915
-
Place of Origin:
-
China
-
Engine Brand:
-
BASHAN
-
SEAT HEIGHT:
-
780mm
-
Wheel Base:
-
770mm
-
Fuel Capacity:
-
8.5L
-
Carburetor Brand:
-
JKPZ30
-
Torque:
-
22N`m/5000r/min
-
Tire:
-
AT25*8/12 AT25810/12
-
Brake:
-
Front and rear disc
-
Max speed:
-
62km/h
Quick Details
-
Displacement:
-
>300cc
-
Brand Name:
-
KNL
-
Tire Size:
-
AT25*8-12/AT25*10-12
-
Dimension:
-
194*109*915
-
Place of Origin:
-
China
-
Engine Brand:
-
BASHAN
-
SEAT HEIGHT:
-
780mm
-
Wheel Base:
-
770mm
-
Fuel Capacity:
-
8.5L
-
Carburetor Brand:
-
JKPZ30
-
Torque:
-
22N`m/5000r/min
-
Tire:
-
AT25*8/12 AT25810/12
-
Brake:
-
Front and rear disc
-
Max speed:
-
62km/h
Recommend Products
ATV
ATV tires generally use mud tires. The vehicle has a very high ground clearance, has a very exaggerated approach angle, departure angle and longitudinal passing angle. It uses a four-wheel drive system, and its ability to get out of trouble is much stronger than that of ordinary off-road vehicles. Because the ATV has four wheels, the stability is much higher than that of a two-wheeled motorcycle.
ATV can not only drive on the beach; riverbeds, forest roads, streams and even worse deserts can be easily overcome.
ATV can not only drive on the beach; riverbeds, forest roads, streams and even worse deserts can be easily overcome.
Standard Components
|
|
|
|
|||
Product Name
|
ATV
|
Tires
|
Front AT25*8/12 + Rear AT25*10-12
|
|||
Model Number
|
01
|
Headlight
|
LED Headlight
|
|||
Motor Type
|
2000W/3000W/4000W motor
|
Suspension
|
Front MacPherson independent suspension/ Rear Independent suspension
|
|||
Gear
|
CVT automatic transmission + 3 speed manual
|
Minimum Ground Clearance:
|
180mm
|
|||
Break Type
|
Front and Rear Disc Brake
|
Color
|
Blue/Green/Red/Black/Carbon
|
|||
OEM
|
Yes
|
MOQ
|
2 Pieces
|
|||
Performance
|
|
|
|
|||
Max. torque
|
22N·m/5000r/min
|
Max speed
|
62 km/h
|
|||
Continued trip mileage
|
≤100 km
|
Loading capacity
|
160Kg
|
|||
Dimension
|
1940*1090*915mm
|
Max climbing
|
≤25 degree
|
|||
Warranty
|
1 year
|
start function
|
Electric Start
|
|||
Packing
|
|
|
|
|||
G.W.
|
215KG
|
N.W.
|
230KG
|
|||
Packing Size
|
195*110*80cm
|
packing
|
Iron Frame + Carton
|
|||
Logisitic
|
|
|
|
|||
Shipping
|
Ocean
|
Loading Port
|
Ningbo/Shanghai Port
|
Factory
Our Certificates
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Contact
Hot Searches