Products
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House
TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House

TECON ABS PVC Plastic Formwork TP60 Wall Lightweight Concrete Mold for Building Construction Coffrage Modular House

FOB Reference Price: Get Latest Price
≥150 Square meters
US $60
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Application:
Living Room
Design Style:
Modern
Place of Origin:
Jiangsu, China
Brand Name:
TECON
Model Number:
Plastic Formwork TP60
Main Components:
Panels, handles, walers, beams, props
Standard Shoring:
TECON Light Duty Prop
Panel Weight:
14 kg/sqm
Max Panel Size:
1.2*0.6 m
Max Fresh Concrete Pressure:
60 kN/sqm(wall); 80 kN/sqm(column)
Max Casting Slab Thickness:
300 mm
Assembly Method:
Assemble at site
Loading Quantity:
180 sqm/20 GP; 450 sqm/40 HQ

Quick Details

Warranty:
NONE
After-sale Service:
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts
Project Solution Capability:
graphic design, total solution for projects
Application:
Living Room
Design Style:
Modern
Place of Origin:
Jiangsu, China
Brand Name:
TECON
Model Number:
Plastic Formwork TP60
Main Components:
Panels, handles, walers, beams, props
Standard Shoring:
TECON Light Duty Prop
Panel Weight:
14 kg/sqm
Max Panel Size:
1.2*0.6 m
Max Fresh Concrete Pressure:
60 kN/sqm(wall); 80 kN/sqm(column)
Max Casting Slab Thickness:
300 mm
Assembly Method:
Assemble at site
Loading Quantity:
180 sqm/20 GP; 450 sqm/40 HQ

Plastic formwork TP60 wall formwork for modular house
Price MAX Panel Size Panel Depeth Panel Usage Time Leading Time
$58/SQM 1200* 600 mm 75 mm 80-100 time 10 days (just panel)

FAQ

1. How to get a quotation?

You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.

Phone: +86-512-65650586

Mobile: +86-18151096613

2. What is the payment term?

By T/T or L/C.

3. What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other system, the lead time is from 30 to 45 days.

For more accurate lead time, please contact us for specific product based on your quantity.

4. What is the package method?

We have standard steel pallet, wooden pallet etc. which suits to container transportation.

5. Do you have any guarantee on the quality?

We have guarantees on the quality on different product basis.

6. Do you offer buy back system or rental business?

We offer buy back system on some of medium and big scale projects, but we do not have any rental business yet.

7. Do you have on-site supervision service?

Yes, we have on-site supervision service for most of our projects across the world except for a few restriction regions.

8. What benefit we can get from TECON?

From TECON, you can get full range of advanced system with excellent quality, our know-how and in-time service. They will lead to increased productivity, labor saving and great cost down on your site as a result.

9. Are you looking for agent or distributor in our country?

Yes, we are looking for agent or distributor worldwide based on win-win relationship. If you have such experience, capability of investment, as well as business plan & goal, we’d be glad to discuss with you in details. TECON has its special agent and distributor policy waiting to support your success in formwork & scaffolding industry.

10. How to purchase your formwork and scaffolding?

For any order you proceed with TECON will basically follow below steps.

Step 01. Confirm the PI based on our proposal after technical & commercial communication – by Customer, TECON Overseas Sales team and Technical team

Step 02. Make the deposit – by Customer
Step 03. Report on production schedule weekly until completion – by TECON Customer Care team

Step 04. Execute pre-shipment inspection – by Customer or Third Party Inspection company

Step 05. Effect the balance payment – by Customer

Step 06. Arrange the loading and shipment after balance payment – by TECON Customer Care team

Step 07. Submit the full set of shipping documents via courier after departure – by TECON Customer Care team
Step 08. Submit the full set of user manual, calculation, shop drawing and assembly drawings – by TECON Overseas Sales team
Step 09. Site supervision – By TECON Site Supervision team

APP
Post My RFQ
WhatsApp
+86-17326049340