- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Rainbow
-
Voltage:
-
380v/415v/440v
-
Dimension(L*W*H):
-
15m*1.2m*2.3m
-
Power (kW):
-
22
-
Weight:
-
8000 KG
-
Motor brand:
-
Siemens
-
Temperature controller:
-
Ormon/RKC
-
Inverter:
-
ABB
-
Contactor:
-
Schneider
-
PLC:
-
Siemens
-
Raw material:
-
PP/PE/PVC
-
Pipe shape:
-
Corrugated pipe
Quick Details
-
Screw Design:
-
Single-screw
-
Screw L/D Ratio:
-
33:1
-
Screw Speed (rpm):
-
72 rpm
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Rainbow
-
Voltage:
-
380v/415v/440v
-
Dimension(L*W*H):
-
15m*1.2m*2.3m
-
Power (kW):
-
22
-
Weight:
-
8000 KG
-
Motor brand:
-
Siemens
-
Temperature controller:
-
Ormon/RKC
-
Inverter:
-
ABB
-
Contactor:
-
Schneider
-
PLC:
-
Siemens
-
Raw material:
-
PP/PE/PVC
-
Pipe shape:
-
Corrugated pipe
Product View
PP PE PVC Single Wall Corrugated Pipe Extrusion Machine
This machine is used to produce pvc pe pp single wall corugated pipe. It is widely used in our life, It can be used such as threading pipe, drain pipe, Shisha pipe, shrinking pipe and so on.
Single wall corrugated pipes, which takes the advantages of high temperature resistance, abrasion resistance, corrosion resistance, high strength.
Product Specification
PP PE PVC Single Wall Corrugated Pipe Extrusion Machine
|
|
|
||
1
|
Single Screw Extruder
|
One Set
|
||
2
|
Mould
|
One Set
|
||
3
|
Corrugated Pipe Forming Machine
|
One Set
|
||
4
|
Winder
|
One set
|
Single Screw Extruder
Screw&Barrel:ZhoushanScrew&Barrel material:38CrMoAlA
Electrical control system: ABB inverter,Schneider Contactor,Siemens switch,Siemens PLC control system,Siemens touch
screen,Omron/RKC temperature controller
Gearbox:Duoling Jiangyin/Guomao
Electrical control system: ABB inverter,Schneider Contactor,Siemens switch,Siemens PLC control system,Siemens touch
screen,Omron/RKC temperature controller
Gearbox:Duoling Jiangyin/Guomao
Mould
Material:40Cr,chromeplated
Corrugated Pipe Forming Machine
1.Closed structure, linked module in the overall closure base does round-trip running
2. It is made of hard mould steel, the forming mould is processed by CNC which could ensure precision of the forming modules. It is convenient to change the modules.
Winder
Single station or double station with tension and frequency control motor
Electrical parts
Products Application
Delivery
FAQ
Q1: Your company is a trading company or a machine manufacturer?
A1:Our company is a plastic machinery manufacturer which is engaged i n to this trade more than 15 years.As a manufacturer,we could supply our machine,service,technical support and maintenance directly and it's more convenient.
Q2: How to get an accurate offer?
A2: Because our offer and technical specification is associated with your final product and requested capacity,we will choose the right model of extruder and mould after understanding all the information,then we could supply our plan.We could fully exchange information by Email, whatsapp or wechat.
Q3: Where is your factory and which port is the nearest to your factory?
A3: My factory is in Qingdao city, Shandong Province and the nearest seaport is Qingdao port.
Q4: How long is the delivery time?
A4: Generally it will take 30-45 days.
Q5: Could you send your engineers to our factory?
A5: Yes,we will send our engineers to your factory for installation,commissioning and training after machines arrive at your
factory.In addition,if you need our engineers available in the future,we also could send our engineers.
If you have any questions, please do not hesitate to contact us. We Look forward to listening to you!
A1:Our company is a plastic machinery manufacturer which is engaged i n to this trade more than 15 years.As a manufacturer,we could supply our machine,service,technical support and maintenance directly and it's more convenient.
Q2: How to get an accurate offer?
A2: Because our offer and technical specification is associated with your final product and requested capacity,we will choose the right model of extruder and mould after understanding all the information,then we could supply our plan.We could fully exchange information by Email, whatsapp or wechat.
Q3: Where is your factory and which port is the nearest to your factory?
A3: My factory is in Qingdao city, Shandong Province and the nearest seaport is Qingdao port.
Q4: How long is the delivery time?
A4: Generally it will take 30-45 days.
Q5: Could you send your engineers to our factory?
A5: Yes,we will send our engineers to your factory for installation,commissioning and training after machines arrive at your
factory.In addition,if you need our engineers available in the future,we also could send our engineers.
If you have any questions, please do not hesitate to contact us. We Look forward to listening to you!
Hot Searches