Quzhou Aiweite Machinery Co. , Ltd. was established in 2018, Through continuous efforts, development, innovation, the company has grown into A R &D, production, processing and assembly as one of the mechanical manufacturing enterprises. From product customization, design and development, sales and after-sales of the entire industrial chain, to provide one-stop solutions.
Aiweite machinery has a wealth of industry experience and mature technical solutions.To high-quality products, reasonable prices prompt delivery, professional services for the global market to provide the overall solution.
- Product Details
- {{item.text}}
Quick Details
-
Size:
-
6250*2500*900mm
-
Product name:
-
Boat Trailer
-
Material:
-
Steel
-
OE NO:
-
SZ-2
-
Axle:
-
Single
-
Brake:
-
Mechanical Brake
-
Color:
-
Customized Color
-
Surface finish:
-
Hot Dip Galvanized Finish
-
Floor & Side Panels:
-
2mm (Support Customization)
-
Type:
-
Boat Trailer
Quick Details
-
Max Payload:
-
1001-2000 kg
-
Brand Name:
-
ZEBANG
-
Place of Origin:
-
Zhejiang, China
-
Size:
-
6250*2500*900mm
-
Product name:
-
Boat Trailer
-
Material:
-
Steel
-
OE NO:
-
SZ-2
-
Axle:
-
Single
-
Brake:
-
Mechanical Brake
-
Color:
-
Customized Color
-
Surface finish:
-
Hot Dip Galvanized Finish
-
Floor & Side Panels:
-
2mm (Support Customization)
-
Type:
-
Boat Trailer
Products Description
Specification
item
|
value
|
Use
|
Boat/yacht Trailer
|
Max Payload
|
1000-2000 kg
|
Place of Origin
|
ZheJiang
|
Brand Name
|
ZEBANG
|
Size
|
6250*2500*900mm
|
Product name
|
Boat Dolly Trailer
|
Brand Name
|
OEM
|
Material
|
Steel
|
OE NO
|
SZ-2
|
Axle
|
Single Axle
|
Color
|
Silver
|
Finish
|
Hot Dipped Galavnized
|
Surface finish
|
Hot Dip Galvanized Finish
|
Company introduction
About us
Certifications
Product packaging
1. Use plastic or steel straps to secure the products to avoid breaking.
2. Cover with the paper shell to reduce friction.
3. Support customized packaging.
2. Cover with the paper shell to reduce friction.
3. Support customized packaging.
FAQ
1.What’s your nearest port?
The nearest port is Ningbo and Shanghai, also accept other Chinese port.
2.What’s your payment terms?
Usually, 30%TT in advance,70%TT before shipment.
3.What’s your delivery time?
For one set, about 15-30 days, for large order, need about 25-40days. Please confirm with us before order.
4.What’s your delivery terms?
FOB,CFR,CIF and others
5. How you packing the goods?
For big chassis, no packaging. For carriage and other small parts, by plastic film. For some special trailers, using carton or
others.
6.Do you accept OEM services?
yes
7.Is customized trailer available?
Yes, please send your specifications or drawing to us, we have the engineer to design for you.
The nearest port is Ningbo and Shanghai, also accept other Chinese port.
2.What’s your payment terms?
Usually, 30%TT in advance,70%TT before shipment.
3.What’s your delivery time?
For one set, about 15-30 days, for large order, need about 25-40days. Please confirm with us before order.
4.What’s your delivery terms?
FOB,CFR,CIF and others
5. How you packing the goods?
For big chassis, no packaging. For carriage and other small parts, by plastic film. For some special trailers, using carton or
others.
6.Do you accept OEM services?
yes
7.Is customized trailer available?
Yes, please send your specifications or drawing to us, we have the engineer to design for you.
Hot Searches