- Product Details
- {{item.text}}
Quick Details
-
Type:
-
Scaffolding prop
-
Place of Origin:
-
Tianjin, China
-
Product name:
-
Scaffolding pipe
-
Material:
-
Q235/Q345 Steel
-
Size:
-
OEM Size
-
Surface:
-
Galvanized Coated
-
Packing:
-
Bundle
-
MOQ:
-
1 Set
-
Thickness:
-
1.6/1.8/2.0/2.2/2.5/3.0mm
-
Color:
-
Customer Requirements
-
Application:
-
Building Construction
Quick Details
-
Warranty:
-
NONE
-
After-sale Service:
-
NONE
-
Project Solution Capability:
-
NONE
-
Type:
-
Scaffolding prop
-
Place of Origin:
-
Tianjin, China
-
Product name:
-
Scaffolding pipe
-
Material:
-
Q235/Q345 Steel
-
Size:
-
OEM Size
-
Surface:
-
Galvanized Coated
-
Packing:
-
Bundle
-
MOQ:
-
1 Set
-
Thickness:
-
1.6/1.8/2.0/2.2/2.5/3.0mm
-
Color:
-
Customer Requirements
-
Application:
-
Building Construction
1 .Diameter range on tube ( inner /outer): 40/48mm ; 48/56mm ; 48/60mm
2
.Thickness range on tube: 1.6mm; 1.85mm; 2.0mm; 2.5mm; 3.0mm
3
.Type: Heavy duty scaffolding prop/light duty scaffolding prop
4
.We can provide all kinds of scaffolding props with high quality at low price
5
.Produced in our own factory,can control the quality much better
Min Height | Max Height | Inner Tube | Outer Tube | Tube Thickness |
1.6m | 2.9m | 48mm | 60mm | 1.4~4.0mm |
1.8m | 3.2m | 48mm | 60mm | 1.4~4.0mm |
2.0m | 3.5m | 48mm | 60mm | 1.4~4.0mm |
2.2m | 4.0m | 48mm | 60mm | 1.4~4.0mm |
3.0m | 5.0m | 48mm | 60mm | 1.4~4.0mm |
3.5m | 6.0m | 48mm | 60mm | 1.4~4.0mm |
1. How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
2. How to pay?
TT and L/C are acceptable and TT will be more appreciated.
3. What is the delivery time?
It depends on order quantity.Generally, the delivery time will be within 10 to 15 days.
4. What is steel quality?
We cooperate with Baosteel, Tewoo, Ansteel,and so on,some big goverment steel factory.
5. How to order from TF ?
Buyer Send Enquiry →Get TF Quotation → Order Confirmation
→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit
→ Strict Inspection during Production → Buyer Arrange Balance Payment
→ Packing → Delivery as per Trade Terms (FOB/CFR/CIF)