Explore More Products
- Product Details
- {{item.text}}
Quick Details
-
Input Voltage(V):
-
AC200~240V 50/60Hz
-
Lamp Luminous Flux(lm):
-
110
-
PCs/ Ctn:
-
4
-
Packing Dimension:
-
560 x 385 x 385mm
-
Product Weight(kg):
-
2.6
-
Product name:
-
ultra thin ceiling light
-
Certification:
-
CE\SAA\FCC
-
Feature:
-
OEM ODM
-
Color:
-
Three Color
-
Function:
-
CCT Adjustable
-
Suitable for:
-
outdoor garden
-
MOQ:
-
10pcs
-
Shape:
-
Round
-
OEM & ODM:
-
Acceptable
-
IP grade:
-
IP20 Wateproof
Quick Details
-
Design Style:
-
Modern
-
Product Dimension:
-
D350*108mm
-
Place of Origin:
-
Guangdong, China
-
Input Voltage(V):
-
AC200~240V 50/60Hz
-
Lamp Luminous Flux(lm):
-
110
-
PCs/ Ctn:
-
4
-
Packing Dimension:
-
560 x 385 x 385mm
-
Product Weight(kg):
-
2.6
-
Product name:
-
ultra thin ceiling light
-
Certification:
-
CE\SAA\FCC
-
Feature:
-
OEM ODM
-
Color:
-
Three Color
-
Function:
-
CCT Adjustable
-
Suitable for:
-
outdoor garden
-
MOQ:
-
10pcs
-
Shape:
-
Round
-
OEM & ODM:
-
Acceptable
-
IP grade:
-
IP20 Wateproof
Products Description
Option
|
Specification
|
|
|
|
|||
Lumen Efficiency
|
120 LM/W
|
|
|
|
|||
Rated Power
|
20W
|
|
|
|
|||
Warranty
|
5 years
|
|
|
|
|||
Product Material
|
UV-anti plastic case
|
|
|
|
|||
Size
|
D350x80mm
|
|
|
|
|||
Function
|
STD / ON-OFF/ EM / MS
|
|
|
|
|||
Color Temperature
|
Tricolor(3000K/4000K/5000K)
|
|
|
|
|||
Input Voltage
|
AC200-240V
|
|
|
|
|||
Features
|
> Up to 120 LM/W@ 3600LM
> Aluminum round shape + Prismatic diffuser UGR<19 > Juntion box for easy installation > Various of function options > Warranty: 5 years |
|
|
|



Project Case
The ASTRO Half Moon Bulkheads are best replacement for 2D CCFL as well as 2D fluorescent and various applications such as Houses Stairs /Corridors Architectural ighting.
Related Products
Packing&Shipping
Company Introduction
Our Company
Toppo Lighting company limited is one of the professional manufacturer speacializing in developing, producing and selling for Led Lighting. As a worldwide LED manufacturer, we have various series of LED lighting which include: LED Panel Light, LED Linear light, LED tri-proof light, LED batten light, Led Trunk linear, LED Tube Light, LED Down Light, LED Ceiling Light, LED Troffer,etc.
Welcome to our factory
We have our own factory with related equipment and can accept your order any time and deal with it asap.
Our Team
We have a professional overseas sales team,we patiently listen to all the suggestion and opinion from our client and provide pretty sales service
Certificate
Toppo aims to ensure all products are certificated by ETL / DLC / FCC/TUV/VDE/CE.In order to guarantee the quality, We ensure our processes are compliant with and certificated by NOA to ISO9001/ISO14001 build the owner laboratory for the daily quality control.
Exhibition
FAQ
Q1.Are you factory or trading company ?
A: We are factory located in Shenzhen,Guang Dong since 2009
Q2. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q3. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q4. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q5. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q6: What's the guarantee time for the products?
A: We offer 3-5 years warranty for all products.
A: We offer 3-5 years warranty for all products.
Q7: How to Make Payment ?
A:30% deposit , 70% balance finished before delivery.We accept payment by T/T , Alibaba pay later and so on.
A:30% deposit , 70% balance finished before delivery.We accept payment by T/T , Alibaba pay later and so on.
Q8: How to deal with the faulty?
A.All the products are under strict quality control to ensure defective rate less than 0.02%. 2.During the guarantee period, if
any problems , we will send new one or spare parts
A.All the products are under strict quality control to ensure defective rate less than 0.02%. 2.During the guarantee period, if
any problems , we will send new one or spare parts
Hot Searches