- Product Details
- {{item.text}}
Quick Details
-
IP Rating:
-
IP44
-
Beam Angle(°):
-
360
-
CRI (Ra>):
-
50
-
Input Voltage(V):
-
AC 100-240V
-
Lamp Luminous Efficiency(lm/w):
-
110-120lm/w
-
Lamp Luminous Flux(lm):
-
2000
-
Working Lifetime(Hour):
-
50000
-
Working Temperature(℃):
-
-20-40
-
Place of Origin:
-
Anhui, China
-
Model Number:
-
MC001
-
Brand Name:
-
MC
-
Product name:
-
Led Light
-
Material:
-
Aluminum+PVC
-
Feature:
-
DIY Assembling Linear Lights
-
LED:
-
COB LED
-
Function:
-
Brightness
-
Battery:
-
Rechargeable Lithium Battery
-
Power:
-
570W
-
Usage:
-
Camping Fishing Emergency Hiking
-
Installation:
-
Ceiling Mounted
Quick Details
-
Color Temperature(CCT):
-
6000K (Daylight Alert)
-
Warranty(Year):
-
1-Year
-
Power Supply:
-
DC
-
IP Rating:
-
IP44
-
Beam Angle(°):
-
360
-
CRI (Ra>):
-
50
-
Input Voltage(V):
-
AC 100-240V
-
Lamp Luminous Efficiency(lm/w):
-
110-120lm/w
-
Lamp Luminous Flux(lm):
-
2000
-
Working Lifetime(Hour):
-
50000
-
Working Temperature(℃):
-
-20-40
-
Place of Origin:
-
Anhui, China
-
Model Number:
-
MC001
-
Brand Name:
-
MC
-
Product name:
-
Led Light
-
Material:
-
Aluminum+PVC
-
Feature:
-
DIY Assembling Linear Lights
-
LED:
-
COB LED
-
Function:
-
Brightness
-
Battery:
-
Rechargeable Lithium Battery
-
Power:
-
570W
-
Usage:
-
Camping Fishing Emergency Hiking
-
Installation:
-
Ceiling Mounted
Product Description
Product Name
|
LED Light
|
Space Size
|
2433mm*4804mm
|
Power
|
552W
|
Voltage
|
AC100-240V
|
Luminous Flux
|
110-120lm/w
|
CRI.
|
>90
|
CCT.
|
6500K (White)
|
Material
|
Aluminum+PVC+ABS
|
Feature
|
DIY Assembling Linear Lights
|
INSTALLATION
Easy DIY set up of the lighting system:
Step 1 build your hexagonal system on the floor according to the instructions supplied.
Step 2 test the lighting structure on the ground to make sure the system is connected correctly.
Step 3 fix the hexagonal system to the ceiling.
Step 4 have a licensed electrician wire the system into the building with a circuit breaker.
Easy DIY set up of the lighting system:
Step 1 build your hexagonal system on the floor according to the instructions supplied.
Step 2 test the lighting structure on the ground to make sure the system is connected correctly.
Step 3 fix the hexagonal system to the ceiling.
Step 4 have a licensed electrician wire the system into the building with a circuit breaker.
Project case
Related Products
Packing&Shipping
FAQ
1.Are you a manufacturer or a trade company?
We are the earliest the manufacturer who design and produce the certain led workshop lights
2.Can I buy samples before placing orders?
Yes.Please feel free to contact us. We’re welcome sample order for a test and a check of quality. Mixed samples are acceptable.
3.What is your payment term?
T/T,and Paypal.This is negotiable.
4.Do you do the OEM & ODM?
Yes. We can do the OEM & ODM. Not only customized products are available, we also provide the auto CAD or 3D drawing for different projects.
5.What is your lead time and the shipping method?
It depends on the order quantity and the season you place the order. Usually we can ship within 3-7 days for a small quantity, and about 30 days for a large quantity. And It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect). Please confirm with us before placing orders.
6.How to deal with the faulty?
Firstly, our products are produced in the strict quality control system and the defective rate will be less than 0.2%. Secondly,during the guarantee period, we will send new lights with new order for the small quantity. For defective batch products, we will repair and resend them to you or we can discuss the solution including re-call according to real situation.
We are the earliest the manufacturer who design and produce the certain led workshop lights
2.Can I buy samples before placing orders?
Yes.Please feel free to contact us. We’re welcome sample order for a test and a check of quality. Mixed samples are acceptable.
3.What is your payment term?
T/T,and Paypal.This is negotiable.
4.Do you do the OEM & ODM?
Yes. We can do the OEM & ODM. Not only customized products are available, we also provide the auto CAD or 3D drawing for different projects.
5.What is your lead time and the shipping method?
It depends on the order quantity and the season you place the order. Usually we can ship within 3-7 days for a small quantity, and about 30 days for a large quantity. And It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect). Please confirm with us before placing orders.
6.How to deal with the faulty?
Firstly, our products are produced in the strict quality control system and the defective rate will be less than 0.2%. Secondly,during the guarantee period, we will send new lights with new order for the small quantity. For defective batch products, we will repair and resend them to you or we can discuss the solution including re-call according to real situation.
Hot Searches