- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
SFeng, SFeng
-
Dimension(L*W*H):
-
Depends on the capacity of boiler
-
Weight:
-
Depends on the capacity of size
-
Certification:
-
ISO 9001, ISO 14001,
-
Design thermal efficiency:
-
101%
-
Control system:
-
PLC+Touch Screen
-
Operation:
-
Fully Automatic Control
-
installation:
-
easy to install
-
Name:
-
SZS Steam Boiler
-
Capacity:
-
10-100 t/h
-
Working pressure:
-
1.2-2.5 Mpa
Quick Details
-
Core Components:
-
water pump, simons plc control, condensing economizer
-
Steam Production:
-
Max. 100t/h
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
SFeng, SFeng
-
Dimension(L*W*H):
-
Depends on the capacity of boiler
-
Weight:
-
Depends on the capacity of size
-
Certification:
-
ISO 9001, ISO 14001,
-
Design thermal efficiency:
-
101%
-
Control system:
-
PLC+Touch Screen
-
Operation:
-
Fully Automatic Control
-
installation:
-
easy to install
-
Name:
-
SZS Steam Boiler
-
Capacity:
-
10-100 t/h
-
Working pressure:
-
1.2-2.5 Mpa
Products Description
Natural Gas/Diesel Fired Steam Boiler SZS
The SZS water tube steam boiler adopts a double-drum vertical D-type furnace structure, with energy-saving devices placed at the tail for additional heating surface. The burner is arranged on the front wall, and the convection tube bundles are placed parallel to the furnace. The combustion gases pass through the rear of the furnace and flow successively through the heater (if present), convection tube bundles, and the rear heating surface before being discharged into the atmosphere through the chimney.
Product Configuration
Model
|
|
SZS10-1.2-Q.Y
SZS10-1.6-Q.Y SZS10-2.5-Q.Y |
SZS15-1.2-Q.Y
SZS15-1.6-Q.Y SZS15-2.5-Q.Y |
SZS20-1.2-Q.Y
SZS20-1.6-Q.Y SZS20-2.5-Q.Y |
SZS25-1.2-Q.Y
SZS25-1.6-Q.Y SZS25-2.5-Q.Y |
SZS30-1.2-Q.Y
SZS30-1.6-Q.Y SZS30-2.5-Q.Y |
SZS35-1.2-Q.Y
SZS35-1.6-Q.Y SZS35-2.5-Q.Y |
|
|||||||
Steam Output
|
T/h
|
10
|
15
|
20
|
25
|
30
|
35
|
|
|||||||
Steam Pressure
|
Mpa
|
1.25/1.6/2.5
|
1.25/1.6/2.5
|
1.25/1.6/2.5
|
1.25/1.6/2.5
|
1.25/1.6/2.5
|
1.25/1.6/2.5
|
|
|||||||
Steam Temperature
|
℃
|
194/204/225
|
194/204/225
|
194/204/225
|
194/204/225
|
194/204/225
|
194/204/225
|
|
|||||||
Feed Water Temperature
|
℃
|
104/20
|
104/20
|
104/20
|
104/20
|
104/20
|
104/20
|
|
|||||||
Thermal Efficiency
|
%
|
105
|
|
|
|
|
|
|
|||||||
Desgin Fuel
|
|
Natural Gas, Diesel, LNG, Light Oil,. etc
|
|
|
|
|
|
|
|||||||
Lingeman blackness
|
|
I<1
|
|
|
|
|
|
|
|||||||
Drain hole diameter of the water level gauge
|
mm
|
25
|
|
|
|
|
|
|
|||||||
Burning Method
|
|
Room combustion
|
|
|
|
|
|
|
|||||||
Kích thước hình dạng vận chuyển
|
t
|
40.0
|
45.0
|
50.6
|
60.0
|
68.2
|
73.6
|
|
|||||||
Kích thước vận chuyển hàng cồng kềnh
|
m
|
7.87×3.4×3.4
|
8.9×3.9×4
|
8.9×3.9×4
|
10.5×4.12×4.15
|
10.5×4.3×4.23
|
11.3×4.3×4.23
|
|
FAQ
1. How can you get the best price quickly?
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
(2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
2. Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Jiangsu Boiler Inspection Institute;
(6).Passed ISO:9001 ,ISO14001,OHASA18001 and ASME(S and U) and A-class boiler certificate.
4. Quality warranty
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed18
months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
5.Terms of payment
T/T 30% of total contract value as down payment;
T/T or L/C 70% of total contract value before delivery.
6.Claim
Any claims by the buyers regarding the machines shipped should be filed within 30 days after arrival of machines at the
destination specified in the relative B/L and supported by a survey report issued by a surveyor approved by the sellers, otherwise the sellers shall refuse to consider. Claims in respect of matters within responsibility of insurance company and/or shipping company will not be considered by the seller.
7. What is the using life of your boiler?
Normally the boiler is designed for 20 years life span, but with right operation and good maintenance, the boiler can be used for 20-25 years.
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
(2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
2. Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Jiangsu Boiler Inspection Institute;
(6).Passed ISO:9001 ,ISO14001,OHASA18001 and ASME(S and U) and A-class boiler certificate.
4. Quality warranty
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed18
months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
5.Terms of payment
T/T 30% of total contract value as down payment;
T/T or L/C 70% of total contract value before delivery.
6.Claim
Any claims by the buyers regarding the machines shipped should be filed within 30 days after arrival of machines at the
destination specified in the relative B/L and supported by a survey report issued by a surveyor approved by the sellers, otherwise the sellers shall refuse to consider. Claims in respect of matters within responsibility of insurance company and/or shipping company will not be considered by the seller.
7. What is the using life of your boiler?
Normally the boiler is designed for 20 years life span, but with right operation and good maintenance, the boiler can be used for 20-25 years.
Hot Searches