Products
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction
Stable portable steel aircraft hangar design/hangar construction

Stable portable steel aircraft hangar design/hangar construction

FOB Reference Price: Get Latest Price
≥200 Square meters
US $25
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Model Number:
CLYR-010-634d
Certificate:
ISO9001,CE,SGS
Column and Beam:
Welded/ Hot rolled H beam
Purlin:
C/Z Shape Steel Channel
Roof and Wall panel:
Sandwich panel,single sheet
Customization:
Style,Color,Material

Quick Details

Grade:
Q345 Q235 H section steel, C/Z section steel
Place of Origin:
Henan, China
Brand Name:
CANGLONG
Model Number:
CLYR-010-634d
Certificate:
ISO9001,CE,SGS
Column and Beam:
Welded/ Hot rolled H beam
Purlin:
C/Z Shape Steel Channel
Roof and Wall panel:
Sandwich panel,single sheet
Customization:
Style,Color,Material

Product Description

Stable portable steel aircraft hangar design/hangar construction

main steel frame

H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe

Secondary frame

hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.

Roof panel

EPS sandwich panel,glass fiber sandwich panel, rock wool sandwich panel ,and PU sandwich panel or steel sheet

Wall panel Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace Round Bar
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Drawing

We can make the design and quotation according to your require or your drawing

Certification

ISO9001:2000,CE.



HI,Dear friend, Pls. A ttention

Steel structure building is one kind of product which can be design as per every proples' different need.

so, if you found that follows example pictures is not as same as your want, even it is very different.

do not worried,

no matter which kind of building you need, prefabricated houseswarehouse

bigger, smaller or multi-storey, just tell me the data or drawing of building what you need.

we will make the exact design, quotation and rendering for you as soon as we can.

(our group have more than 10 years experience on steel structure )


Send your inquiry today .



Project Cases
Completed Projects

Recent Projects

Design Teams
Design Teams

Canglong Group has an efficient, professional and high-quality team of designers. Team members have at least 15 years of experience in steel structure projects design in this industry.

The design team of Canglong Group adopts the international mainstream design software, and carries out design analysis in strict accordance with international standards in the design process of each project. While ensuring the safety, energy saving and high efficiency of buildings, it effectively reduces the material loss and waste of the project and ensures the economic design scheme of each project.

Materials
Materials

Packaging & Shipping
Packing and Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

APP
Post My RFQ
WhatsApp
+86-17326049340