Rubber Pipe Plug (Duct pipeline occluder ) is made by enhancing natural rubber, each pipe sealing bag before delivery, will be 1.5 times the rated working pressure and diameter corresponding model test conditions. In order to ensure the strength of the pipe sealing balloon structure, we use a safety factor to the tube three times the rated working pressure seal. Pipeline shutoff balloon by balloon, pressure gauge, three, six meters long special pneumatic hose, pump components. Floors in the building closed water tests can withstand 2-6 storey natural water pressure. Duct sealing bag suitable for sealing all kinds of cast iron repair pipes, glass pipes, PVC pipes, PPR pipes, double-wall spiral pipe etc, maintenance side leakage. The pipe sealing balloon
compared with other pipe sealing bag, light weight, easy to carry, easy to operate, features simple construction.
- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
inflatable rubber bladder
-
Main material:
-
natural rubber
-
Cord fabric:
-
raw silk
-
Function:
-
construction formwork
-
work press:
-
0.005-0.12mpa
-
warranty:
-
18 monthes
-
Shape:
-
rectangle,octagon,hexagon etc.
-
inspection:
-
factory or the third party
-
Feature:
-
high tensile strength
-
after sale service:
-
on time
-
Quality:
-
excellent
Quick Details
-
Processing Service:
-
Moulding
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
JINGTONG
-
Model Number:
-
inflatable rubber bladder
-
Main material:
-
natural rubber
-
Cord fabric:
-
raw silk
-
Function:
-
construction formwork
-
work press:
-
0.005-0.12mpa
-
warranty:
-
18 monthes
-
Shape:
-
rectangle,octagon,hexagon etc.
-
inspection:
-
factory or the third party
-
Feature:
-
high tensile strength
-
after sale service:
-
on time
-
Quality:
-
excellent
Products Description
Title goes here.
Working Principle
Working Principle
Be to use high-quality rubber pipe sealing bag made by a pneumatic method to inflate, when the gas pressure inside the balloon plugging meet the requirements, the water shut off airbag fill the pipeline section, the use of pipe sealing balloon wall and pipe friction generated by plug leaks, so as to achieve the target pipe without seepage purposes.
Specification
Section Shape
1> Diameter (D) : From 0.1m to 2.2 m.
2> Total Length (TL) : From 0.5 m to 28m.
3> Other specification also available upon customer’s request.
2> Total Length (TL) : From 0.5 m to 28m.
3> Other specification also available upon customer’s request.
Construction steps
Usage
◎ Preparation: connect all parts rubber plug accessories.
◎ Open pipeline checking outlet, put rubber plug down slowly, and then aerated rubber plug up to right pressure.
Tip: avoid aiser member joints.
◎ Joint of rubber plug and hose interface should be tied or fastened with wire to avoiding unglued
◎ Inject water into building checking outlet up to level of building deck, and then checking pipeline and fittings. If find leaks, mark them and fix them after draining. If no leaks, the water level should be stable. Irrigation continuation 15 minutes, it is qualified if the water level does not drop holding for 5 minutes
◎ Deflate the rubber plug, pull plug out of pipeline, keep plug not damaged. Water flow away after taking out plug, if water level reduces slowly, pipeline clogged, need clear up
◎ Rubber plug also can checking whether Squat toilet leaks. Put rubber plug in drain outlet and aerated, Irrigation to squat toilet, if water level reduces, it comes out leaks somewhere, or not strict closure.
◎ Water testing should conduct by stratified and make record.
◎ Rubber plug is pipe plugging, Closed water and gas test, be professional products used in building pipe plugging.
◎ Open pipeline checking outlet, put rubber plug down slowly, and then aerated rubber plug up to right pressure.
Tip: avoid aiser member joints.
◎ Joint of rubber plug and hose interface should be tied or fastened with wire to avoiding unglued
◎ Inject water into building checking outlet up to level of building deck, and then checking pipeline and fittings. If find leaks, mark them and fix them after draining. If no leaks, the water level should be stable. Irrigation continuation 15 minutes, it is qualified if the water level does not drop holding for 5 minutes
◎ Deflate the rubber plug, pull plug out of pipeline, keep plug not damaged. Water flow away after taking out plug, if water level reduces slowly, pipeline clogged, need clear up
◎ Rubber plug also can checking whether Squat toilet leaks. Put rubber plug in drain outlet and aerated, Irrigation to squat toilet, if water level reduces, it comes out leaks somewhere, or not strict closure.
◎ Water testing should conduct by stratified and make record.
◎ Rubber plug is pipe plugging, Closed water and gas test, be professional products used in building pipe plugging.
Hot Searches