The working principle of the heater:
1. Short-circuit heating: the host is a transformer with a special structure, and the movable yoke is used to directly pass through the sleeve bearing or other heated workpieces. When working, turn on the power supply of the host machine, and the workpiece (equivalent to the secondary winding) is induced to generate a short-circuit current and be heated.
Installation and commissioning
2. Place the yoke on the end face of the core of the main unit.
3. Check whether the wiring of the plug and the socket is consistent, the grounding should be good, and then insert the plug into the power socket with the control switch.
4. Turn the function selection switch to the manual control position, close the power supply, and then the red indicator light is on.
5. Press the start button, the host is energized, then the green indicator light is on and the red light is off; press the stop button, the red light is on and the green light is off. At this point, the commissioning is over and ready for use.