Products
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track
e  hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track

e hook ratchet strap use with e track end hooks for ratchet strap lashing straps e track

FOB Reference Price: Get Latest Price
≥1 Pieces
US $1.2
≥10 Pieces
US $1
≥100 Pieces
US $0.8
≥250 Pieces
US $0.7
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Model Number:
TD111901
Place of Origin:
Zhejiang, China
Color:
Silver
Usage:
wide usage
Surface:
Zinc Painting
Product Name:
E Hook
BS:
2000KG
Logo:
Custom Logo Accepted
Sample:
Provided
MOQ:
1pcs
OEM:
Accepeted

Quick Details

Finish:
ZINC
Application:
Heavy Industry, Automotive Industry
Material:
steel
Model Number:
TD111901
Place of Origin:
Zhejiang, China
Color:
Silver
Usage:
wide usage
Surface:
Zinc Painting
Product Name:
E Hook
BS:
2000KG
Logo:
Custom Logo Accepted
Sample:
Provided
MOQ:
1pcs
OEM:
Accepeted
Product Description

Item

E track

Material Metal
B.S 1363GS
Color As require
Size 6'
Package 100pcs/ct
Sample Available

The "Rope tie off" is an old term that dates back many years ago. This strap clips into the E-Track and gives you a way to connect an S-hook or snap hook to E-Track. This is commonly used in box trucks and landscape trailers to give you a quick way to connect a utility strap to the E-Track.

FAQ

Q1: How do you ensure your product and service quanlity?

We have a series of professional testing devices , and a ll the production line will strictly supervised by our QC persons. We offer the test report before every shipment


Q2: Do you have certificates?
we have ISO9001, ISO14001, GS, TUV


Q3: How can I get samples?
We are pleasure to offer samples for quality checking.


Q4: What are your payment terms?
30% T/T Deposit, 70% against the Copy of B/L; others need to negotiate.


Q5: How about your delivery time?
Delivery time will be within 60 days since the PI is confirmed and we receive the advance payment.

APP
Post My RFQ
WhatsApp
+86-17326049340