- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
SOKUN
-
Model Number:
-
hex lag screw
-
Grade:
-
4.8
-
Mark:
-
According to customer''s requirement
-
Size:
-
M6-M20; 1/4"-3/4"
-
finish:
-
zinc plated and hot dip galvanized
-
material:
-
low carbon steel
-
Length:
-
20mm-300mm
-
Delivery time:
-
Normally in 30-40 days
-
Package:
-
Cartons&pallets or according to customer''s requirement
Quick Details
-
Finish:
-
Black, ZINC, Plain, Black Oxide
-
Material:
-
Brass, Stainless steel, Steel, Aluminium, Titanium, NICKEL, Bronze
-
Measurement system:
-
INCH, Metric
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
SOKUN
-
Model Number:
-
hex lag screw
-
Grade:
-
4.8
-
Mark:
-
According to customer''s requirement
-
Size:
-
M6-M20; 1/4"-3/4"
-
finish:
-
zinc plated and hot dip galvanized
-
material:
-
low carbon steel
-
Length:
-
20mm-300mm
-
Delivery time:
-
Normally in 30-40 days
-
Package:
-
Cartons&pallets or according to customer''s requirement
Product Description:
hex lag screw
Standard | DIN571, ASME B18.2.1 |
Grade | 4.8 |
Finish | zinc plated/hot dip galvanized |
Size | M6-M20; 1/4"-3/4" |
Delivery time | Normally in 30-40 days. |
Package | Cartons&pallets or according to customer's requirement. |
Product Features:
Product Details:
More Products:
Our Main Products:
Production Process:
QC E ngineering G raphics :
Testing & Control:
Detectability:
Production Workshop & Equipment:
The Way Of Shipping:
FAQ:
Q1.What is your main products?
A1:Our main products are nonstandard parts, fasteners, stamping parts and machined parts.
Q2. How to ensure that every process's quality?
A2:Every process will be checked by our quality inspection department which insures every product's quality. In the production of products, we will personally go to the factory to check the quality of products.
Q3.How long is your delivery time?
A3:Our delivery time is generally 30 to 45 days. Or according to the quantity.
Q4. What is your payment method?
A4:30% value of T/T in advance and other 70% balance on B/L copy.
For small order less than 1000USD, would suggest you pay 100% in advance to reduce the bank charges.
Q5.Can you provide a sample
?
A5:Sure, Our sample is provided after receiving the tooling cost and courier fees.