- Product Details
- {{item.text}}
Quick Details
-
Product Name:
-
Plastic meter box
-
Model:
-
Three-phase
-
Material:
-
ABS/PC plastic
-
Protection Level:
-
IP65
-
Package:
-
Carton Case
-
Delivery time:
-
5-10 Days
-
Certificate:
-
CCC, ISO 9001
-
Sample:
-
Available
Quick Details
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
QHECO
-
Model Number:
-
Meter box
-
Product Name:
-
Plastic meter box
-
Model:
-
Three-phase
-
Material:
-
ABS/PC plastic
-
Protection Level:
-
IP65
-
Package:
-
Carton Case
-
Delivery time:
-
5-10 Days
-
Certificate:
-
CCC, ISO 9001
-
Sample:
-
Available
Product Description
Specification
Product name
|
Plastic meter box
|
Row
|
Single phase/ three-phase
|
Box material
|
ABS plastic
|
Cover material
|
PS transparent plastic
|
Protection level
|
IP65
|
1. Who are you?
Located in Shandong, China, we are an OEM/ODM enterprise founded in 2006;
With 18 years of production experience, we are a high-tech enterprise specializing in the research and production of high and low voltage power transmission and distribution equipments.
2.What can I buy from you?
Various high and low voltage distribution boxes, customized distribution equipment, power distribution set.
3.Why should I buy from you not from other suppliers?
Qinghua ECO has 18 years of professional production experience and lightning speed delivery.
4.Can I get a sample to check your quality?
Of course. We will provide you with samples at a very low price so that you can check our quality. Samples under $10 are free.
5.How can I order customized products?
The best way is that you give us engineering drawings and equipment list, we will arrange engineers to serve you. If there is no drawings, we will also provide solutions for you.
6.How do you guarantee the quality?
Our quality inspection includes the following processes:
Material inspection: Check the material surface and roughly dimension.
First Production inspection: To ensure the critical dimension in mass production.
Sampling inspection: Check the quality before sending to the warehouse.
Pre-shipment inspection: 100% inspected by QC assistants before shipment.
7. How about the lead time?
Samples usually take about 1 week and mass production takes 2-3 weeks.
8.What will you do if we receive poor quality parts?
Please send us the pictures and our engineers will rebuild it for you in the fastest time possible.
Hot Searches