1. One tube, one thick plastic bag, one nylon bag with two white belts on both sides, two stickers, two swatches on both sides. (according to customers)
2. Around 40m per roll
3. Label: item/length/color, or customized.
Port of loading:
Shanghai or Ningbo
Delivery time:
30 days after received the deposit