- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
yongliwei
-
Model Number:
-
1312 304 124
-
Product Name:
-
piston
-
Item No.:
-
1315 334 034
-
Applicable Industries:
-
Manufacturing, Machinery Repair, Construction works, Energy & Mining
-
Gearing Arrangement:
-
Input axis and output flange
-
Manufacturing Process:
-
Die casting Option Low pressure casting
-
Package:
-
Multilayer wooden box/pallet, with big plastic bag inside
-
Lead Time:
-
2-25 days
-
Color:
-
Black, grey
-
Housing Material:
-
Aluminum & iron casting
Quick Details
-
OE NO.:
-
1315 334 034
-
Size:
-
7*7*2
-
Place of Origin:
-
Zhejiang, China, China
-
Brand Name:
-
yongliwei
-
Model Number:
-
1312 304 124
-
Product Name:
-
piston
-
Item No.:
-
1315 334 034
-
Applicable Industries:
-
Manufacturing, Machinery Repair, Construction works, Energy & Mining
-
Gearing Arrangement:
-
Input axis and output flange
-
Manufacturing Process:
-
Die casting Option Low pressure casting
-
Package:
-
Multilayer wooden box/pallet, with big plastic bag inside
-
Lead Time:
-
2-25 days
-
Color:
-
Black, grey
-
Housing Material:
-
Aluminum & iron casting
Click the Figure Below to Start Consultation
Yongliwei Sale Gearboxes No.
The following are some models, which are constantly being updated. If the required model is not in the table, please consult us. Transmission, retarder, power take-off, booster, transfer case and its parts are also sold.
FAQ
Q1: Are your products will be same which I receive compare with your photos on Alibaba?
A: For most products YES; but for some products, it will be changed without notice when factory changes its design, the mark, product origin, even the part number.
So please be known it is possible if you receive the goods with different part number or package. All the parts are sold referring to the part number.
The picture on ALIBABA is only for your reference.
Q2: What is your terms of payment? How about your delivery time?
A: For stocked products in our warehouse, T/T 100% as deposit;
Delivery time: about 2-7 days. For unstocked products, T/T 30% deposit, the balance 70% before delivery;
Delivery time: around 45-60 days. For some special parts ,we may increase the deposit.
Q3: What is your terms of delivery?
A: EXW, FOB more for us, any terms are acceptable if you have special requirement.
Q4: Which gearboxes assembly and parts do you working on?
A: Gearboxes assembly and its parts, gears, synchronizer, PTO, gearbox housing, bearings, main shaft, input shaft, top cover, sensors, wireness, repair kits, switches ...
Q5: Which series gearbox parts are your advantages?
A: Gearboxes assembly and gearboxes parts covers:
5S 5HP 6S 6AP 6AS 6HP S6 9S 9AS 12AS 12TX 16S, ETA, 6DS 9JS, TV211, VT2214, DT, DF6S, QJS6, DC,, HC, CA5, CA6, 5T, HW907
...
Q6: How can I find the parts that I need?
A: Please provide us photo of your needed gearbox parts or tell us parts number of gearbox part.
Hot Searches