- Product Details
- {{item.text}}
Quick Details
-
Voltage:
-
220V
-
Power:
-
22KW
-
Weight (KG):
-
550
-
Name:
-
Industrial Dryer Machine
-
Product name:
-
Rotary Drying Machine
-
Keywords:
-
Rotary Dryer Machine
-
Usage:
-
Drying Wet Materials
-
Function:
-
Multi-function
-
Raw material:
-
Wheat Straw
-
Color:
-
Customized Color
-
Feature:
-
High Efficiency Low Cost
Quick Details
-
Type:
-
Rotary Drying Equipment
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
songbai
-
Voltage:
-
220V
-
Power:
-
22KW
-
Weight (KG):
-
550
-
Name:
-
Industrial Dryer Machine
-
Product name:
-
Rotary Drying Machine
-
Keywords:
-
Rotary Dryer Machine
-
Usage:
-
Drying Wet Materials
-
Function:
-
Multi-function
-
Raw material:
-
Wheat Straw
-
Color:
-
Customized Color
-
Feature:
-
High Efficiency Low Cost
Product description
Factory direct supply grain drying machine Coffee grain drying machine Grain dryer drying machine
Technical Parameters
CapacityDimensions (mm)
|
Capacity (kg)
|
Power (KW)
|
Dehumidifier fan (W)
|
Reducer
|
3000*1100*1450
|
200
|
1.5
|
150
|
ZQ200
|
3800*1100*1450
|
300
|
2.2
|
150
|
ZQ200
|
3100*1300*1500
|
300
|
2.2
|
150
|
ZQ200
|
4000*1250*1650
|
500
|
3.0
|
170
|
ZQ200
|
4800*1500*1700
|
1000
|
4.0
|
370
|
ZQ250
|
6000*1800*2100
|
2000
|
7.5
|
370
|
ZQ350
|
7800*1800*2100
|
3000
|
11.0
|
370
|
ZQ350
|
9000*2300*2500
|
5000
|
15.0
|
550
|
ZQ500
|
Product Advantages
1、Use
unique inner curtain type cold trap
, simple and practical structure.
2、The
working temperature
of the cold trap is≤40℃(optional ≤60℃, ≤88℃).
3、
Refrigeration system
adopts brand compressor, large refrigeration capacity, less energy consumption.
4、The vacuum series is reliable, with high working vacuum.
4、The vacuum series is reliable, with high working vacuum.
5、The
heating and drying process
is automatically controlled, the heating temperature fluctuation is small and the control is accurate.
6、The
water content of the product
can be as low as 1~3%,while the colour, aroma and taste of the original product and its nutritional composition can be maintained, and the shelf life is long.
Product Application
Snack food industry:
melon seeds, peanuts, cashews, almonds, chestnuts, hazelnuts, pine nuts, walnuts, etc.
Coarse grain processing industry: corn, sorghum, rice, glutinous rice, barley, wheat, tartary buckwheat, mung bean, soybean, red bean, highland barley, flour, etc.Oil pressing industry: sesame, rapeseed, soybean, peanut, etc.
Chemical industry: drying and heating chemical raw materials.
Tobacco processing industry: roasting processing.
Feed processing industry: raw materials roasting.
Tea industry: killing, drying.
Coarse grain processing industry: corn, sorghum, rice, glutinous rice, barley, wheat, tartary buckwheat, mung bean, soybean, red bean, highland barley, flour, etc.Oil pressing industry: sesame, rapeseed, soybean, peanut, etc.
Chemical industry: drying and heating chemical raw materials.
Tobacco processing industry: roasting processing.
Feed processing industry: raw materials roasting.
Tea industry: killing, drying.
About us
Zhengzhou Songbai Machinery Co. Ltd
is devoted to offer carbonization furmace series, mobile gas heater, organic ferizer production series, and animal feed productione series. We can provide various solutions for different raw materials, which can meet the market demands. We had passed the IS09001 quality system and got the CE certification for all of our machines.
Packing & Delivery
FAQ
1.Could I have prices of your products?
Welcome. Please feel free to send us an email here. You will get our reply in 24 hours
2.How much the Courier freight will be for the samples?
Courier freight depends on the quantity,weight and carton size and your area.
3. How about the package?
Net weight: as the customers' requirement.
4. How does your factory do regarding quality control?
My company always attaches great importance to quality controlling from the very beginning to the very end.
5. How about your delivery time?
Generally, it will take 7 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
2.How much the Courier freight will be for the samples?
Courier freight depends on the quantity,weight and carton size and your area.
3. How about the package?
Net weight: as the customers' requirement.
4. How does your factory do regarding quality control?
My company always attaches great importance to quality controlling from the very beginning to the very end.
5. How about your delivery time?
Generally, it will take 7 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Hot Searches