Products
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant
Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant

Low Price Mineral Zhengzhou Iron Ore Xinxiang Desorption Electrowinning Equipment Gold Processing Plant

FOB Reference Price: Get Latest Price
≥1 Sets
US $50000
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Keywords:
CIL Plant
Usage:
CIP CIL Plant
Color:
customerized
Certificate:
ISO9001:2008
Advantage:
High capacity
Installation:
Engineer guide
Feature:
Long Service Life
After-sale service:
provided
Quality:
High level
Market:
Global

Quick Details

Weight (KG):
1
Place of Origin:
Shandong, China
Brand Name:
jinpeng
Keywords:
CIL Plant
Usage:
CIP CIL Plant
Color:
customerized
Certificate:
ISO9001:2008
Advantage:
High capacity
Installation:
Engineer guide
Feature:
Long Service Life
After-sale service:
provided
Quality:
High level
Market:
Global
Desorption electrowinning equipment
Desorption electrolysis system is applied to recover solid gold from carbons in the cyaniding process. It is equipped with
liquid-level controlling system, temperature controlling system and automatic controlling system.Scope of Application : High
temperature and high pressure desorption electrolysis system

working principle

Desorption electrowinning equipment including: desorption column, electrolytic cell, electric heater, desorption fluid tank,
filter, electric control cabinet, rectifier cabinet, circulating pump, activated carbon regeneration furnace, etc.
When the desorption system is added with anions which are more easily absorbed by activated carbons, Au(CN)2 is replaced by anion and the gold desorption is achieved. After the carbons loaded with gold are desorbed, pregnant solution is process via ionization.At last, solid gold is attained.

Advantage

1. High-efficiency: when the grade of loaded carbon reaches 3000g/t, the desorption rate can reach more than 96%, the barren carbon tenor with this equipment comparing with that of normal desorption electrowinning equipment will reduce to its one fourth.

2. Rapid: the temperature of desorption electrowinning can reach as high as 150°C(generally 30-55°C higher than in other kind system), and the working pressure of system can reach as high as 0.5 Mpa (generally 0.2-0.5 Mpa higher than in other kind system), so the desorption electrowinning is rapid with 12 hours typically(50%-60 % time shorted).

3. Low consumption: the same temperature for desorption, no need of heat-exchanging, working speed is rapid, power consumption is 1/2-1/4 of normal system.
Product Paramenters
Desorption electrowinning equipment
Model
Suitable size
Operating parameter
Mine scale(t/d)
Crudes quality(g/t)
GKJD-200
<150
2--8
Temperature:150±2OC
(Na0H)PH:≥13.5
Desorption pressure tank:0.5(Mpa)
Electrolytic tank pressure:0.45(Mpa)
GKJD-300
150-300
2--8
GKJD-500
300-500
2--8
GKJD-700
300-500
2--8
GKJD-1000
500-1000
2--8
GKJD-1500
500-1000
2--8
GKJD-2000
1000-2000
2--20
GKJD-2500
1000-2000
2--20
GKJD-3000
1000-2000
2--20
GKJD-3500
2000-3000
2--20
GKJD-4000
2000-3000
2--20
GKJD-5000
2000-3000
2--20
GKJD-8000
3000-5000
2--20
Success cases
Turkey 4,000tpd copper slag plant
Ore type: Copper slag after smelting Design capacity: 4,000 tons per day
ARMENIA 2M TPA COPPER FLOTATION PLANT
Ore type: Copper sulphide ore Design capacity: 2,000,000 tons per annual
NIGERIA 75KTPA GOLD CIL PLANT
Ore type: Oxide Gold Ore Design capacity: 750,000 TPA
Zambia 110tph copper flotation plant
Ore type: Oxide & sulfide copper ore Design capacity: 110tph
6000tpd Tin processing plant, Bolivia
6000tpd Tin processing plant, Bolivia Raw ore grade:2-3%, Recovery:92%
Xiaodonggou Molybdenum mine, Xilin mining company
Location: Keshiketeng banner, Inner Mongolia, 43°00′15″N, 117°42′30″E Ore type: Molybdenum ore Design capacity: 2,000,000 TPA
Recommend Products
Packaging & Delivery
We makes a classification package plan for all the kinds of equipments and materials. Transport the goods to Chinese port in batches, handle the procedure.
APP
Post My RFQ
WhatsApp
+86-17326049340