- Product Details
- {{item.text}}
Quick Details
-
Wind resistance:
-
Anti 100km/h
-
Anti-seismic:
-
8-magnitude earthquake
-
Structure:
-
Light steel
-
Door:
-
Steel Security Door
-
Certification:
-
CE/FSC/ISO9001
-
Window:
-
Aluminum Window
-
Roof:
-
Steel Roofing
-
Function:
-
Working Office
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
Yaoda
-
Size:
-
Standard or customized
-
Wind resistance:
-
Anti 100km/h
-
Anti-seismic:
-
8-magnitude earthquake
-
Structure:
-
Light steel
-
Door:
-
Steel Security Door
-
Certification:
-
CE/FSC/ISO9001
-
Window:
-
Aluminum Window
-
Roof:
-
Steel Roofing
-
Function:
-
Working Office
EPS Sandwich Panel Light Steel Structure Container House
Wind resistance: | Grade 11 |
Earthquake resistance: | Grade 7 |
Snow load capacity of roofing: | 0.6 kn/m2 |
Live load capacity of roofing: | 0.6 kn/m2 |
External and internal wall heat transmission coefficient: | 0.35 kcal/m2hc |
Wall permitted loading: | 0.6 kn/m2 |
Second floor load capacity: | 180kg/m2 |
Live load of corridor: | 2.5kn/m2 |
Density of Rock wool: | 60 kg/m2 |
Density of PU: | 40 kg/m2 |
Density of EPS: | 12 kg/m2 |
Density of IPES: | 20 kg/m2 |
Delivery time: | Normally 20-25 days |
Container loading: | 300m2 |
For more product information , please click >> | CONTACT US > |
Inexpensive but multifunctional:
Can be used as temporary living
room/dormitory/home/office/meetingroom/classroom/kitchen/canteen.
Strength and durability:
Shock-resistant & wind-resistant q235(yield strength)steel frame.
Good quality eps sandwich panel brings heat insulation and damp proof make
Comfortable living. The prefab house is designed as water proof, so extra waterproof treatment is unnecessary
Movable and recyclable:
Can be moved by any kind of vehicle after convenient disassembly construction site/ campsite/mine lot/mountain area/disaster area)
Prefab houses can be recycled more than 5 times in it`s 20 years long service lifetime.
100% of the steel structure and 90% of the eps panel can be recycled in next assembly.
Convenient installation and Labor-saving:
All the parts of steel frame and eps panel are done in factory, all need to do in the construction field is to connect and stack
100 sqm prefab house will just cost 2 days by only 4 workers.
The welding and cutting of steel is considered to be specialized labor and can increase construction expenses, yet overall it is still lower than conventional construction.
Transport:
Prefabricated modules can also be easily transported by ship, truck or rail, because they already conform to standard shipping sizes.