- Product Details
- {{item.text}}
Quick Details
-
Use:
-
Industrial
-
Place of Origin:
-
Quang Nam, Vietnam
-
Model Number:
-
Q235B Mesh Deck for Teardrop Pallet Rack
-
Depth:
-
36''-48'', 36''-48''
-
Weight Capacity:
-
UDL Capacity: 2000-2500lbs
-
Width:
-
46''-58'', 46''-58''
-
Surface treatment:
-
Zinc
-
Size:
-
Customized Size
-
Supports Qty:
-
3/4
-
Loading Capacity:
-
2000-2500lbs
-
Delivery time:
-
20-30 Days
-
Warranty:
-
1 Year
-
Payment Terms:
-
T/T 30% Deposit
-
Port:
-
Da Nang Port
-
Certification:
-
CE
Quick Details
-
Type:
-
Multi-Level
-
Material:
-
Steel Wire
-
Feature:
-
Corrosion Protection
-
Use:
-
Industrial
-
Place of Origin:
-
Quang Nam, Vietnam
-
Model Number:
-
Q235B Mesh Deck for Teardrop Pallet Rack
-
Depth:
-
36''-48'', 36''-48''
-
Weight Capacity:
-
UDL Capacity: 2000-2500lbs
-
Width:
-
46''-58'', 46''-58''
-
Surface treatment:
-
Zinc
-
Size:
-
Customized Size
-
Supports Qty:
-
3/4
-
Loading Capacity:
-
2000-2500lbs
-
Delivery time:
-
20-30 Days
-
Warranty:
-
1 Year
-
Payment Terms:
-
T/T 30% Deposit
-
Port:
-
Da Nang Port
-
Certification:
-
CE
Q235B Mesh Deck for Teardrop Pallet Rack
About
Wire mesh decks provide added strength and versatility to any pallet racking system.
It is arranged on the beam to reduce the deformation deflection of the pallet and place the pallet unit cargo at different depths.
This decking is perfect for industrial applications, as it is designed to help provide additional safety and meet local fire code requirements.
Advantage
l Easy to install -Put it directly on the step beam, No fastener reinforcement required.
l Cheaper than wooden pallets, but with more load ing capacity .
l With better light-admitting quality and ventilation.
l Reduce the likelihood of fire hazard.
l Improve visibility of storage products.
l Maintenance free.
l Good economy and long service life.
l Increased storage capacity.
l Not easy to be contaminated with dust, clean and hygienic.
l It ’ s durable after e lectroplating or powder coating treatment .
External size |
42"X46" |
|
Internal size |
42"X46" |
|
Mesh size |
2.5"X4" |
|
Loading capacity |
1000Kg |
|
Qty of package |
1960/40HC |
|
Material |
Q235 |
|
Surface treatment |
PC, Zinc, HDG |
Standard specification
Depth | Width |
Mesh pattern |
Supports |
Loading capacity (lbs) |
36" |
46'' | 2.5''*4'' | 3 | 2000 |
42" |
||||
44'' | ||||
48'' | ||||
36'' | 52'' | 2.5''*4'' | 3 | 2000 |
42'' | ||||
44'' | ||||
48'' | ||||
36'' | 58'' | 2.5''*4'' | 4 | 2500 |
42'' | ||||
48'' |
Case
Factory
Official website of Vietnam factory
Geographical position
Da Nang Port
• Third Largest Port System in Central Vietnam
• Lies at one end of the East–West Economic Corridor.
• Authority Shipping Line: Vietnam National Shipping Lines (Vinalines)
As being located near the third largest trading port in Vietnam which has the direct shipping lane, BHD Racking Vietnam Factory believes your orders will be delivered in the short time.
Shipment
Item | Loading Port | Destination Port | Period |
1 | Da Nang Port |
Long Beach Port |
20 days |
2 | Da Nang Port |
Houston Port |
35 days |
3 | Da Nang Port |
Miami Port |
40 days |
4 | Da Nang Port |
New York Port |
45 days |
Factory capacity
BHD Racking Vietnam Factory factory delivers 80 containers per month. After receiving the order, production can be completed in 20 days.
Advantage
l No Import Duty to U.S.A.,COO can be provided
l No Anti-dumping & Anti-subsidy Margin for Rack
l Lower Labor Cost
l USA Production – Shorter Production Time
l Port city – Da Nang: 45min Drive
l Direct Shipping Lane: Da Nang Port to Long Beach & Los Angeles Port
FAQ:
Q1: What is delivery time of your Vietnam factory?
A1: It depends on your volume. Normally our delivery time is 25 days. But when volume is large, please communicate with our sales rep so as to arrange a quickest delivery time.
Q2: What is your production capacity of Vietnam factory?
A2: 80 containers per month.
Q3: Are there any tariff or duties on your products to the United States or Australia?
A3: We have CO (Certificate of origin) from Vietnam. So there are no tariffs or duties.
Q4: Has your factory just been built or completed?
A4: Our factory has been completed as a whole in May 2019. You can see all the equipment and facilities in FACTORY part of website navigation. We sincerely welcome you to visit our factory.
Q5: What are the international trading terms provided?
A5: EXW / FOB / CIF / DDU. In fact, we can do all the international trading terms.
Q6: Do you have any certificate of products in Australia?
A6: We have RMI certificate of United States and AS-4084 certificate of Australia. We have valid
certificates required by the local market.
Q7: What are the payment terms?
A7: Generally our payment terms are 30% T/T in advance as deposit, 70% T/T against copy of B/L as balance. If you have any special requirements, please contact our sales rep directly.
Q8: How is the packaging of your products?
A8: Corrugated paper, carton box, crosstie, pallet, angle steel, plastic film, steel tie and air bag are used for proper packaging. All our products are packaged for export, so we have rich experience in export packaging.