Washer, also known as washer, is a part usually used to pad between the connector and the nut, its purpose is to serve as a spacer to protect the surface of the connector from nut chafing, to disperse the pressure of the nut on the connector, and to reduce the detachment caused by vibration.
- Product Details
- {{item.text}}
Quick Details
-
Application:
-
General Industry, Automotive Industry
-
Place of Origin:
-
HeBei
-
Function:
-
Connection,Fastening and Decoration
-
Finish::
-
black, ZINC, Plain
-
Model Number::
-
copper washer ZG0151
-
Logo:
-
customizable
-
Brand:
-
IVOK
-
Reliability test::
-
mechanical dimentions,salt spray endurance test
-
Shape:
-
roundness
-
Service:
-
Customized OEM
Quick Details
-
Finish:
-
Plain
-
Style:
-
divider
-
Material:
-
Brass, Stainless steel, Steel, Aluminium, 18-8 STAINLESS STEEL, Bronze
-
Application:
-
General Industry, Automotive Industry
-
Place of Origin:
-
HeBei
-
Function:
-
Connection,Fastening and Decoration
-
Finish::
-
black, ZINC, Plain
-
Model Number::
-
copper washer ZG0151
-
Logo:
-
customizable
-
Brand:
-
IVOK
-
Reliability test::
-
mechanical dimentions,salt spray endurance test
-
Shape:
-
roundness
-
Service:
-
Customized OEM
Production Process
Description:
More Detail Informations
|
|
|
|
|||
Available Material |
1.Stainless Steel: SS201, SS303, SS304, SS316, SS410, SS420;
2.Carbon steel: C1006,C1010,C1018,C1022,C1035K,C1045; 3.Brass: C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200CuZn37), C28000(CuZn40); 4.Aluminum: Al6061, Al6063 etc or as your requirements |
|
|
|||
Hardness
|
Carbon Steel:HRC:28~35 ,HV450~700
Alloy Steel:HRC:32~39(grade10.9) HRC:39~44(grade12.9) |
|
|
|||
Available Finish
|
Zinc plated, Nickel plated, Bronze, Copper,Phosphate, Oxidation black, Passivation, Tin, Dacromet, Gold, Chrome, Silver,
Phosphorization,Zinc-nickel alloy plated etc. |
|
|
|||
Sample Available
|
The sample is free of charge if we have the existing tooling,you only need to pay for the freight cost
|
|
|
|||
Delivery time
|
Samples time 3-5 working days, Lead time 25-30 working days
|
|
|
|||
Package
|
Bulk in PE bag or Small boxes.then in carton, pallet
|
|
|
|||
Port of Loading
|
Tianjin port
|
|
|
|||
Management system
|
ISO9001:2015
|
|
|
|||
Certificate
|
ISO.SGS,ROHS
|
|
|
Guess what you like
Hot Searches