- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Villas, Hotels, Restaurants, Hospitals, Cafe Shops
-
Color:
-
Optional
-
Floor:
-
Base Floor Plate
-
Wall:
-
EPS Sandwich Panle
-
Roof:
-
EPS Sandwich Panel
-
Window:
-
Aluminum Window
-
Kitchen:
-
Custom Requirement
-
Bathroom:
-
Custom Requirement
Quick Details
-
Place of Origin:
-
Henan, China
-
Product name:
-
Two storey prefab garage with loft apartment above
-
Material:
-
Steel Frame/Sandwich Panel
-
Application:
-
Villas, Hotels, Restaurants, Hospitals, Cafe Shops
-
Color:
-
Optional
-
Floor:
-
Base Floor Plate
-
Wall:
-
EPS Sandwich Panle
-
Roof:
-
EPS Sandwich Panel
-
Window:
-
Aluminum Window
-
Kitchen:
-
Custom Requirement
-
Bathroom:
-
Custom Requirement
luxury container house prefab house in nepal price

usage |
Villas, Hotels, Restaurants, Hospitals, Cafe Shops |
foldable container house size |
3400*12000mm/ 2400*6000mm/2400*12000mm/3400*6000mm/3400*9000 |
steel |
Square tube and bending steel plate |
Wall |
50mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet |
Wall color |
White color and optional colors |
Roof |
50mm EPS sandwich panel /rock wool sandwich panel ,0.326/0.376/0.426/0.476mm steel sheet |
Door |
Security door or steel wood door with lock /optional doors |
Window |
Aluminum sliding door, PVC sliding/ swing window with security bar |
Floor |
Fire-proof board /optional floor |
Decoration wall |
Optional : PVC cladding ,WPC cladding |
Electricity |
Optional standard |
Install Time: |
2 workers 18mins |
Wind resistance: |
wind speed≤120 km/h |
Earthquake resistance: |
Grade 7 |
Snow load capacity of roofing: |
0.6kn/m2 |
Live load capacity of roofing: |
0.6kn/m2 |
Wall permitted loading: |
0.6kn/m2 |
Heat conductivity coefficient: |
0.35kcal/m2hc |
Delivery time: |
About 10-15 working days |
Container loading: |
12 sets/1*40HQ |
Foldable Container House advantages:
1. Environmental , no waste produced during assemble, no trash under construction.
2. Flexibility when fixing doors, windows and interior partitions.
3. Modern appearance, optional colors for the walls/panel and roof.
4. Cost saving and convenient transportation.
5. Safe and stable.
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.