- Product Details
- {{item.text}}
Quick Details
-
Center Height (mm):
-
47 mm
-
Max.Transformer Capacity(kVA):
-
4 kVA
-
Place of Origin:
-
Guangdong, China
-
Weight (KG):
-
100
-
Dimension(L*W*H):
-
84X51X106 cm
-
Wire Diameter Range (mm):
-
0.1 - 2.5 mm
-
After Warranty Service:
-
Video technical support
-
After-sales Service Provided:
-
Field maintenance and repair service
Quick Details
-
Max. Load (KG):
-
100 KG
-
Marketing Type:
-
New Product 2022
-
Length of Axis (mm):
-
130 mm
-
Center Height (mm):
-
47 mm
-
Max.Transformer Capacity(kVA):
-
4 kVA
-
Place of Origin:
-
Guangdong, China
-
Weight (KG):
-
100
-
Dimension(L*W*H):
-
84X51X106 cm
-
Wire Diameter Range (mm):
-
0.1 - 2.5 mm
-
After Warranty Service:
-
Video technical support
-
After-sales Service Provided:
-
Field maintenance and repair service
Product Description
PLC Pneumatic crochet winding machine
Application
coil
Feature
Pneumatic
Machine Parameters
Toroidal core spc |
Min outer diameter 25mm; Max outer diameter 130mm after finished |
Chuck height |
47mm(For fit the product, highly interchangeable |
Wire diameter range |
Max 2.5 four wire |
Cylinder bore |
50mm or 63mm |
Weight |
100kg |
Power supply |
AC 220V 50Hz |
Supply air pressure |
0.4≤P≤1MPa(Device working pressure:0.4-0.6MPa) |
Maximum power |
200W |
Control method |
Foot switch |
Traverse method |
Stepping motor (3PCS) |
Traverse direction |
Left and right manual control |
Count |
0-9999turns |
Product Details
FAQ
Q: How to buy your products ?
A: We have some products in stock , you can take away the products after you arrange the payment ;
Q: What’s the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The price will be adjusted appropriately as the
price fluctuation of raw material in the market.
Q: What’s the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about one week to finish the production