- Product Details
- {{item.text}}
Quick Details
-
Rolling thinckness:
-
0.8-1.0mm
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
FORWARD
-
Voltage:
-
380V 50Hz 3phases
-
Dimension(L*W*H):
-
6500*1000*1300
-
Weight:
-
2.5 kg
-
Marketing Type:
-
Hot Product 2020
-
Product name:
-
CD UD Section Roll Former Drywall Metal Profile Making Machine
-
Forming Stations:
-
12 Stations
-
Raw Material:
-
GI,PPGI
-
Roller material:
-
Cr12 Steel Quenched
-
Shaft material:
-
45# Steel,Diameter: 50mm
-
Cutting blade material:
-
Cr12Mov
-
Cutting Type:
-
Servo Tracking Cutting,Non Stop
-
Machine Frame:
-
6MM thick steel plate welded
-
Motor Brand:
-
Lichao,Shanghai
-
PLC control box:
-
Taiwan or Japan Brand
Quick Details
-
Type:
-
Tile Forming Machine
-
Tile Type:
-
Colored Glaze Steel
-
Production Capacity:
-
20M/MIN
-
Rolling thinckness:
-
0.8-1.0mm
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
FORWARD
-
Voltage:
-
380V 50Hz 3phases
-
Dimension(L*W*H):
-
6500*1000*1300
-
Weight:
-
2.5 kg
-
Marketing Type:
-
Hot Product 2020
-
Product name:
-
CD UD Section Roll Former Drywall Metal Profile Making Machine
-
Forming Stations:
-
12 Stations
-
Raw Material:
-
GI,PPGI
-
Roller material:
-
Cr12 Steel Quenched
-
Shaft material:
-
45# Steel,Diameter: 50mm
-
Cutting blade material:
-
Cr12Mov
-
Cutting Type:
-
Servo Tracking Cutting,Non Stop
-
Machine Frame:
-
6MM thick steel plate welded
-
Motor Brand:
-
Lichao,Shanghai
-
PLC control box:
-
Taiwan or Japan Brand
Professional steel angle bead machine angle bead making machine
1. Specifications of CD UD Section Roll Former Drywall Metal Profile Making Machine
Decoiler |
a. Coil inner diameter: 450-550mm
b. Coil max width: 300mm
|
perforation machine
|
a.Material of mold: Cr12 quenched b.Power: 3kw c.Punch speed:12m/min |
Roll forming machine |
a. Number of forming steps: 12 stations b. Shaft material: 45# steel with quenched treatment, precision machined, c. Roller material: bearing steel with quenched treatment d. Transmission: by gear
e. Forming speed: 25-30m/min
|
Shearing system |
a.The material of blade: Cr12Mov, Hardening HRC 58-62℃ b.Length Tolerance:10m±1.0mm C. Power supply: Hydraulic station |
Hydraulic station |
a. Hydraulic motor Power:4kw c.Hydraulic pressure : 12Mpa |
PLC station |
PLC control system, Delta . You can set the cutting length in the PLC. |
equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
2.If the equipment are out of work in the guarantee period, the buyer needs our repairman to come to buyer’s factory, the buyer should be responsible for the tickets(including round-trip ticket), the fee of transportation to the buyer’s factory andaccommodation. Required to change spare parts, the buyer should afford the freight fee and we don’t ask extra fee.
C. Training
During installation and adjustment of the equipment, our engineers shall provide the training to
buyer’s personnel request to operate and maintain the equipment.
Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.
D. Lifetime services
Lifetime services to every customer.
Q1. What's your payment terms and delivery time?
A1:
30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery.
Of course your payment terms are acceptable.
After we get down payment, we will arrange production. About 30-45 days for delivery.
Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: W
e provide 18 months free warranty and free technical support
for the whole life of any machine.
If the broken parts can't repair, we can send the new parts
replace the broken parts freely, but you need pay the express cost by yourself.
If it is beyond the warranty
period,
we can negotiate to solve the problem, and we supply the technical support for the whole life
of the equipment.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),
then we can pick up you.