Products
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor
China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor

China Supplier Wholesale high quality cheap price Building Material data center construction antistatic raised floor

FOB Reference Price: Get Latest Price
≥500 Meters
US $18.5
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Design Style:
Traditional
Material:
Metal
Place of Origin:
Guangdong, China
Brand Name:
NUORAN
Model Number:
HDG
COLOR:
Grey , White
SIZE:
600mm x 600mm
Certificate:
ISO9001:2008 SGS SONCAP PVOC,CN Test Report
Surface Treatment:
Ceramic
sample:
free

Quick Details

Warranty:
More than 5 years
Project Solution Capability:
total solution for projects
Application:
Office Building
Design Style:
Traditional
Material:
Metal
Place of Origin:
Guangdong, China
Brand Name:
NUORAN
Model Number:
HDG
COLOR:
Grey , White
SIZE:
600mm x 600mm
Certificate:
ISO9001:2008 SGS SONCAP PVOC,CN Test Report
Surface Treatment:
Ceramic
sample:
free

China Supplier Wholesale  high quality cheap price Building Material data center construction antistatic raised floor:

Product Description

The surface of Ceramic  veneer, bottom galvanized steel plate, surrounded by black conductive electrostatic PVC edge, the bottom of high quality galvanized steel (or iron or aluminum)

Process characteristics

Ceramic finished Raised Floor  because of its green environmental protection and no pollution; flame retardant, heat insulation, sound insulation, anti-corrosion performance is good; the appearance is neat and beautiful, strong decoration and comfortable driving; bearing capacity and high impact resistance, antistatic performance; surface roughness and size precision is high, the floor can be interchanged etc. functional characteristics, has become the new generation of overhead floor.

Product application

Ceramic finished  floor has been widely used in telecommunications, power electronics, microelectronics, medical and other industries in the control room, computer room, electric power control room, clean purification workshop requirements such as anti-static place.
Precautions for using calcium sulfate antistatic floor
1, the use of environmental requirements, relative humidity: RH45-65%
2, the movable floor is forbidden to wash with water.
3, no hard, sharp shock, extrusion, scratch veneer and plastic layer.
4, avoid direct sunlight irradiation, so as to avoid premature discoloration and aging of the facing layer

Material structure:

The Ceramic finished raised  floor is made of non-toxic non bleached plant fiber as reinforcement material, combined with solidified calcium sulfate crystal, and made by pulse pressing process, and the four angle independent supporting structure. The surface of the floor selects the HPL surface layer of the Asian American brand, around the use of conductive adhesive strip edge, the bottom is made of high quality galvanized steel plate. The bearing and the crossbeam are molded by high quality galvanized steel sheet, and the height of the screw rod can be adjusted arbitrarily. After the floor paved, the whole flat, no color difference effect.

Features:

APP
Post My RFQ
WhatsApp
+86-17326049340