Products
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding
high efficiency 15m heavy duty mast climber platform scaffolding

high efficiency 15m heavy duty mast climber platform scaffolding

FOB Reference Price: Get Latest Price
≥1 Sets
US $2000
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Brand Name:
GOHIGHER
Hoisting Speed:
High load Moment
Weight (KG):
10000 kg
Application:
Building Construction,Bridge
Color:
Optional
Mast section:
0.5m*0.5m*1.508m
Platform Section Size:
1.5m*1.35m*0.65m
Single Mast (Single Mast):
2.2kw*2
Surface Treatment:
Powder Coating/Hot Dip
Model:
MCWP200-30D
Customized:
Acceptable

Quick Details

Max Lifting Height:
200M
Loder Weight:
3600/2000/1500 kg
Place of Origin:
Beijing, China
Brand Name:
GOHIGHER
Hoisting Speed:
High load Moment
Weight (KG):
10000 kg
Application:
Building Construction,Bridge
Color:
Optional
Mast section:
0.5m*0.5m*1.508m
Platform Section Size:
1.5m*1.35m*0.65m
Single Mast (Single Mast):
2.2kw*2
Surface Treatment:
Powder Coating/Hot Dip
Model:
MCWP200-30D
Customized:
Acceptable
Product Overview

MCWP200-30D Mast Climbing Work Platform

Mast Climbing Work Platform MCWP200-30D Mast Climbing Work Platform, adopting rack & pinion driving system, is used for external decoration and cleaning of buildings, glass curtain wall construction and maintenance and so on. With maximum length of 30m long platform, there is enough space for materials and workers ,so the working efficiency is greatly improved.There is also telescopic platform available to adapt different shape of facade. Also the length of platform can be adjusted as required at project sites. It adopts rack & pinion transmission with complete set of safety devices to ensure the security of workers. The installation and dismantling of our platform is very easy. The driving unit are complete system without installation at site. Equipped with mobile chassis, it is very easy to transfer project sites and convenient to transport
PRODUCT SPECIFICATIONS
Single Mast
Double Mast
Min/Min Platform Length
4/10m
11/30m
Max Load Capacity
2000/1500 kg
3600/2000kg
Lifting Speed
0~6m/min
0~6m/min
Maximum Lifting Height
200m
200m
Free Standing Height when working
6 m
6 m
Platform Section Size
1.5m×1.35m×0.65m
1.5m×1.35m×0.65m
Mast Section Size
0.5m×0.5m×1.508m
0.5m×0.5m×1.508m
Driving System
2.2kw×2
2.2 kw×2 +2.2 kw×2
FEATURES AT A GLANCE
Safety devices a. Fall arrest device b. Loading capacity limiter c. Limit switch d. Upper limit protection device e. Lower limit protection device f. Door limit protection device g. Escaping window limit protection device h. Bell warning device i. Emergency stop protection device j. Buffering protection device k. Motor overload protector l. Transformer short-circuit protection device m. Phase sequence protection device
Details Images
Wall tie
Tie in
Wall attachment
APP
Post My RFQ
WhatsApp
+86-17326049340