- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
FOYA
-
Voltage:
-
Customized
-
Product name:
-
thresher machine farm mung bean diesel engine bean thresher machine
-
Matched power:
-
7.5-11 kw motor or 12 hp diesel engine
-
Dimension:
-
2460*1400*1650mm
-
Weight:
-
460-700kg
-
Efficiency:
-
2000-4000kg/h (for corn)
-
Shaft rotate speed:
-
620-750 r/min
-
Cleaning way:
-
Screen & blower
-
Keywords:
-
bean thresher machine
-
Color:
-
Customrized
Quick Details
-
Marketing Type:
-
Hot Product 2020
-
Type:
-
Multifunction
-
Use:
-
Threshing grain, beans, vegetable seeds
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
FOYA
-
Voltage:
-
Customized
-
Product name:
-
thresher machine farm mung bean diesel engine bean thresher machine
-
Matched power:
-
7.5-11 kw motor or 12 hp diesel engine
-
Dimension:
-
2460*1400*1650mm
-
Weight:
-
460-700kg
-
Efficiency:
-
2000-4000kg/h (for corn)
-
Shaft rotate speed:
-
620-750 r/min
-
Cleaning way:
-
Screen & blower
-
Keywords:
-
bean thresher machine
-
Color:
-
Customrized
Maize peeler and thresher machine farm mung bean diesel engine bean thresher machine
This bean thresher machine can be used to thresh rice, wheat, sorghum, various beans and vegetable seeds without changing the machine. It has the characteristics of high threshing efficiency, compact structure and large output. The machine can be equipped with a motor or a diesel engine, and it can also be connected to the tractor drive shaft for work.
Q1: Are you trading company or manufacturer?
A1: We are manufacturer.
Q2: Do you have your own R&D team?
A2: Yes, we can customize products as your requirements.
Q3: How about the quality?
A3: We have the best professional engineer and strict QA and QC system.
Q4: Can we be your distributor?
A4: We are looking for distributor and agent all over the world.
Q5: How’s the package?
A5: Normally are
Plywood box packing
, but also we can pack it according to your requirements.
Q6: How’s the delivery time?
A6: It depends on the quantity you need, 1-25 days usually.