- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
/
-
Product name:
-
Automotive Stamping Mould
-
Size:
-
Customized
-
Service:
-
OEM
-
Package:
-
Customers Specific Requirement
-
Application:
-
engine mount
-
Certificate:
-
TS16949
-
Delivery time:
-
15-25 Days
-
Drawing Format:
-
Dwg .step .igs
-
Color:
-
Customized Colors
Quick Details
-
Shaping Mode:
-
Punching Mold
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
shaoyi
-
Model Number:
-
/
-
Product name:
-
Automotive Stamping Mould
-
Size:
-
Customized
-
Service:
-
OEM
-
Package:
-
Customers Specific Requirement
-
Application:
-
engine mount
-
Certificate:
-
TS16949
-
Delivery time:
-
15-25 Days
-
Drawing Format:
-
Dwg .step .igs
-
Color:
-
Customized Colors
Auto Stamping Die
Free CAE analysis, fast, modeling, quotation in 24hours.

Product Paramenters
Product Name
|
IATF16949
factory custom precision metal progressive stamping die factory
|
|
|
|
|||
Material
|
SKD11, DC53, D2, 45#, CR12MOV, P20, etc.
|
|
|
|
|||
Product Thickness
|
0.1-12.00mm
|
|
|
|
|||
Finish
|
Nickel plating, Sn plating, Tin plating, Zinc plating, Chrome, Heat Treatment, Plating, Degreasing, Electrophoresis, etc.
|
|
|
|
|||
Standard
|
DIN GB ISO JIS BA ANSI
|
|
|
|
|||
Design file format
|
dwg, dxf, step, x_t, top, igs
|
|
|
|
|||
Size
|
As per requirement.
|
|
|
|
|||
Tooling manufacturing cycle
|
3 Weeks to 10 Weeks,The exact time may depend on the precision you require for your product.
|
|
|
|
|||
Forming way
|
Metal stamping, Cutting / Punching / Bending / Welding / Deep Drawing
|
|
|
|
|||
Press machine tonnage
|
100T to 400T
|
|
|
|
|||
Experience
|
15 years of experience in automotive mold design and manufacturing and automotive metal parts manufacturing
|
|
|
|
|||
Application
|
Industrial, Furniture, Automobile, Motorcycle, Household Electrical Appliances, Computer, etc.
|
|
|
|
|||
Cycle Count
|
Under normal usage, the lifespan of the mold can reach up to 300,000 cycles.
|
|
|
|
Manufacturing Materials
|
|
|
|
|||
Steel plate
|
hot dip galvanized sheet
|
|
5052 stretched aluminum plate
|
|||
|
electro galvanized sheet Tinplate
|
|
6063 stretched aluminum plate
|
|||
|
Composite steel plate
|
|
6082 stretched aluminum plate
|
|||
|
Color coated steel plate
|
|
5754 stretched aluminum plate
|
|||
|
|
|
5083 stretched aluminum plate
|

APQP Program Process


Drawing input
Stamping Analysis
Press Forming Analysis
3D Process Manufacturing
Process development
Process optimization
Mold production process

Product and mould Design ➡
CNC
➡
Wire erosion ⬇
⬇ Mold assembly
⬅ Hot treatment (e.g. of metal)
⬅
Electric spark
Testing mould andsampling ➡
Inspection&sampleapproved ➡
Packaging for shipment
Experimental Equipment
3D blue light Vickers hardness Roughness meter Rockwell hardness Coordinate measuring
scanner tester tester machine(CMM)
Spectrometer
Optical profile projector Universal
Testing machine
Our Certification
Cooperative Clients

Frequently Asked Questions

Q1: Is your organization committed to the concept
A: Yes, no matter whether in laser cutting,bending,stamping or CNC machining,
oftotal quality management?
QC will conduct the first sample inspection and random inspection during the
pro-
cessing to ensure thequality of the products.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - -
Q2: How many checks are performed on a project?
A: Usually, products will go through the following four inspections: incoming in-
spection, production first inspection, sampling inspection, and pre-shipment inspec-
tion. Among them,sampling inspection will be conducted multiple times.
tion. Among them,sampling inspection will be conducted multiple times.
- -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Q3: Will you be able to work with our engineering
team to review drawings and provide quick, stimated
pricing for
desired
changes?
A: Yes, our engineers respond very quickly. If there is anything to be modified in the
product, we can offer you a new price as soon as you tell us.
product, we can offer you a new price as soon as you tell us.
- -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- -
- -
Q4: What kinds of information do you need for a quote?
A: Kindly please provide the product drawing in PDF, and will be better if you can
provide it in .dwg / .stp /. igs / .stl, Send drawing.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Q5: What tolerances can Bergek achieve?
A:There is not a given set of tolerances that fits all processes and materials. In every
case, the final tolerances on your part will depend on a number of factors, including but
not
limited to:●Part size ●Design Geometry ●The number, type, and size of features
●Material(s) ●Surface finish ●Manufacturing process Once your order is confirmed, we
will
review your design and provide a design for anufacturing review, pointing out any
areas
where we may not be able to achieve your desired tolerances. It’s helpful if you
can specify
which areas in your design have critical tolerances that must be met and
which can be
slightly modified if needed to reduce the time and costs involved. Here
are some general
tolerance guidelines: General tolerances for CNC machining in metal
and plastic Refer to
DIN ISO 2768 All manufacturing and technical specifications need
to be clearly specified in
the 2D drawings in order to be followed.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Q6: Will your company signan NDA?
A: Yes, We will strictly follow the confidentiality agreement to protect the rights and
interests of our customers.
Q7: OEM/ODM customer's logo printed is available?
A: Yes,OEM/ODM,customer's logo welcomed.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Q8: if we don't have a shipping forwarder in China,
would you do this for us?
A: We can offer you the best shipping line to ensure you can get the goods timely
at the best price.
at the best price.
Hot Searches