- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
JUHE
-
Main Frame:
-
Plastic coated round tube,Galvanized round pipe
-
Pipe diameter:
-
25mm,32mm,48mm,60mm
-
Pipe thickness:
-
1.2mm/1.5mm/1.8mm or according to your needs
-
Film roll:
-
Manual film roll / Electric film roll
-
Size:
-
Customized Size
-
Length:
-
60-200 m, or customized
-
Height:
-
2-10 meters
-
Roofing:
-
Sandwich Panel. Single Steel Sheet
-
Door:
-
Rolling Door
-
Material:
-
Q235B/Q345B Low Carbon Steel
Quick Details
-
Grade:
-
Q235/Q355B
-
Tolerance:
-
±1%
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
JUHE
-
Main Frame:
-
Plastic coated round tube,Galvanized round pipe
-
Pipe diameter:
-
25mm,32mm,48mm,60mm
-
Pipe thickness:
-
1.2mm/1.5mm/1.8mm or according to your needs
-
Film roll:
-
Manual film roll / Electric film roll
-
Size:
-
Customized Size
-
Length:
-
60-200 m, or customized
-
Height:
-
2-10 meters
-
Roofing:
-
Sandwich Panel. Single Steel Sheet
-
Door:
-
Rolling Door
-
Material:
-
Q235B/Q345B Low Carbon Steel
Products Description
Wholesale Factory Price Outdoor Fabric Building Structure Animal Horse livestock Shelters Sheds Cattle Goat Livestock Tents
![](https://cdn.bestsuppliers.com/seo_products_img/juhe1718/7df45107497733a8bdf4fb5700bd4ffa.jpg!/rotate/180)
The steel structure buildings is a customized product. no matter small or large building, our engineers will help you design it.
it is very popular to use in a variety of purposes including storage, work spaces and living accommodation.
It is low cost than concrete building, easy installation, environment friendly, light weight, corrosion-proof, short construction time, longer life to use.
We could give you suggestions according to your climate. We also could make totally according to your design.
Prefabricated steel structure buildings including the main steel structures, secondary steel structures, cladding materials, window&doors, bolts etc.
we will according your project to design and quote , will offer the low costs and stable building for you.
Prefabricated steel structure cow shed use the high quality steel structure for the framework,steel sheet or sandwich panel for the wall/roof, this shed protects the cows from storm and rain.cold and warm, the cowshed can be small or large, we can customize the shed as per clients' requirements.
Specification
|
|
|
||
Items
|
|
Specification
|
||
Main Steel Frame
|
Column
|
Q235, Q355 Welded H Section Steel
|
||
|
Beam
|
Q235, Q355 Welded H Section Steel
|
||
Secondary Frame
|
Purlin
|
Q235 C and Z purlin
|
||
|
Knee brace
|
Q235 Angle Steel
|
||
|
Tie Rod
|
Q235 Circular Steel Pipe
|
||
|
Brace
|
Q235 Round Bar
|
||
|
Vertical and Horizontal Support
|
Q235 Angle Steel, Round Bar or Steel Pipe
|
||
Maintenance system
|
Roof Panel
|
EPS Sandwich Panel / Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
||
|
Wall Panel
|
Sandwich Panel / Corrugated Steel Sheet
|
||
Accessories
|
Window
|
Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
|
||
|
Door
|
Sliding Sandwich Panel Door / Rolling Metal Door
|
||
|
Rainspout
|
PVC
|
||
Live load on Roof
|
|
In 120kg/Sqm (Color steel panel surrounded)
|
||
Wind Resistance Grade
|
|
12 Grades
|
||
Earthquake-resistance
|
|
8 Grades
|
||
Structure Usage
|
|
Up to 50 years
|
||
Finishing Options
|
|
Vast array of colors and textures available
|
||
Paint Options
|
|
Alkyd paiting, two primary painting, two finish painting
(Primer 、Medium paint 、top coat, epoxy zinc etc.) Or Galvanized. |
prefabricated Steel Structure Design Livestock Farm Shed Goat /Cattle Farms cow shed Building poultry farms
1.Prefabricated steel structure building is manufactured and constructed using prefabrication.
1.Prefabricated steel structure building is manufactured and constructed using prefabrication.
It consists of factory-made components or units that are transported and assembled on-site to form the complete building.The building is made from welding H section steel as column and beam. Some buildings also have crane beam, which made from H steel beam too. Galvanized C, Z section steel are as wall purlin and roof purlin. Each component uses welds, bolts or rivets to connect. Wall and roof are made of metal steel sheet or sandwich panel.
2. Steel Structure House Advantages
(1).Good in heat and sound insulation, good corrosion resistance and light weight;
(2).Roofing and wall uses light sandwich panel or color single panel, which has good earthquake resistance and integration;
(3).Multiple disassembly and assembly, with the rate of recovery up to 70%.
3.Steel Structure House Usage
Steel structure is widely used in the construction site as temporary office, factory, warehouse, city office, civil resettlement,4S stores and other temporary buildings,etc.when you build a steel structure building, there are a lot of chooices for the type and apperance ,
For structure frame: you can make the building high and low span, lean to building, H section frame or tube frame ,hanrail, fence etc For the building coverage: you can choose brick wall height, single steel sheet, sandwich panel, skylight belt, ventilation fitting, out gutter, inner gutter, dow spout etc For the window and door: you can choose sliding door , electricity roller shutter door, swing door, exist, sliding window, swing window,top-hung window,vent etc
4.Production and processing
Our steel structure building have many applications and uses. Workshop, warehouse, office building, multi-story building, hangar,garage, livestock farm,poultry farm ect.
(1).Low cost, convenient
(2).Easy assembly and disassembly many times without damage
(3).Widely used in construction site, office building dom ect
(4).Good environmental protection
Details Images
![](https://cdn.bestsuppliers.com/seo_products_img/juhe1718/757919bf04893e7fb2e902aa0fa0a700.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/juhe1718/a95a7c9af4bd36cf9e74070152fb4029.jpg!/rotate/180)
Features:
Steel structure livestock shed
![](https://cdn.bestsuppliers.com/seo_products_img/juhe1718/6f157361154c360c834eb6beeb7f1969.jpg!/rotate/180)
Why Choose Us to offer steel structure workshop building:
4. Efficiency is our pursuit. Every inquiry ,emails will be replied immediately. Every questions will be paid high attention.
5. We also have possessed more than 40 sets of large precise and domestically advanced processing equipments, including large gantry planing machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and soon.
6.We will offer details packing list for every container when load so it will be easier to unload.
7. "Moral personality decides product quality." is our guarantee to the products. "Customers come first." is our everlasting pursuit. Believe your choose, we'll give you a satisfied answer.
Steel Structure
Shandong Juhe Steel Co. LTD
Was founded in 2013. After more than 10 years of steady development, It has now become a high-tech, diversified, export-oriented international private enterprise integrating research and development, design, production, installation and construction and service. manufacture enterprises in China, also has waterproof anti-corrosion insulation engineering, construction curtain wall engineering, building engineering construction general contracting qualification, be included in the construction industry modernization production base in Shandong province. The core competitiveness of the company comes from the unremitting pursuit of technological breakthroughs. Now, there are more than 100 senior technical personnel of various kinds, and many universities and scientific research institutions to establish cooperative relations. With the help of internal and external intellectual resources, relying on steel structure, we continue to innovate in various aspects and achieve new breakthroughs.
Customer Album
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
FAQ
Wholesale Factory Price Outdoor Fabric Building Structure Animal Horse livestock Shelters Sheds Cattle Goat Livestock Tents
Q1: How long does it take to get my building?
A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)
Q2: What are the benefits of steel construction?
Q2: What are the benefits of steel construction?
A: 1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.
Q3: Why choose JU HE?
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.
Q3: Why choose JU HE?
A: At JU HE, the customer is the first priority. We don't pull any gimmicks. We are veteran owned and
operated business, unmatched in customer service. We have more than 10 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.
Q4: How can l get the quotation of the project?
operated business, unmatched in customer service. We have more than 10 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.
Q4: How can l get the quotation of the project?
A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.
Q5: Do you offer designing service for us?
Q5: Do you offer designing service for us?
A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,
supermarket, auto dealer shop, shipping mall, hotel etc.
Q6: Do you provide samples?
supermarket, auto dealer shop, shipping mall, hotel etc.
Q6: Do you provide samples?
A: Yes, we could offer the sample for free but do not pay for the cost of transportation.
Q7: What is your terms of payment ?
Q7: What is your terms of payment ?
A: L/C, T/T, and Western Union.
Q8: How about your quality control?
Q8: How about your quality control?
A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.
Q9: Can you provide the installation help?
Q9: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.
Dear Customer
If you have drawings, welcome to share drawings with us, quotation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
1 Location (where will be built? ) which country? which city?
2 Size: Length*width* Eave height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
2 Size: Length*width* Eave height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
7 thermal insulation If yes, EPS,fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quantity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max.Lifting height _____m
6 brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
7 thermal insulation If yes, EPS,fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quantity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max.Lifting height _____m
Hot Searches