- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
Yuanda Boiler
-
Dimension(L*W*H):
-
Depends on boiler capacity
-
Weight:
-
Depends on boiler capacity
-
Product name:
-
1 ton 2 ton 4 ton 6 ton 8 ton 10 ton 15 ton 20 ton Steam Boiler
-
Capacity:
-
1-40 ton per hour
-
Applicable fuel:
-
coal,biomass, rice husk,coconut,cashew,palm shell,etc
-
Material:
-
Q345R Steel Plate
-
Color:
-
Sliver or customization
-
Operation style:
-
automatic chain grate stoker
-
Thermal efficiency:
-
>82%
-
Application field:
-
industrial production
-
Company:
-
65 years boiler factory
Quick Details
-
Core Components:
-
boiler body
-
Steam Production:
-
1 to 40 ton /h
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
Yuanda Boiler
-
Dimension(L*W*H):
-
Depends on boiler capacity
-
Weight:
-
Depends on boiler capacity
-
Product name:
-
1 ton 2 ton 4 ton 6 ton 8 ton 10 ton 15 ton 20 ton Steam Boiler
-
Capacity:
-
1-40 ton per hour
-
Applicable fuel:
-
coal,biomass, rice husk,coconut,cashew,palm shell,etc
-
Material:
-
Q345R Steel Plate
-
Color:
-
Sliver or customization
-
Operation style:
-
automatic chain grate stoker
-
Thermal efficiency:
-
>82%
-
Application field:
-
industrial production
-
Company:
-
65 years boiler factory
Package 1 ton 2 ton 4 ton 6 ton 8 ton 10 ton 15 ton 20 ton Water tube Biomass wood rice husk Coal Fired Steam Boiler
I.General introduction:
1. Boiler capacity:1-40ton/h
2.Stem pressure:1.0Mpa(10bar),1.25Mpa(13bar), 1.6Mpa(16bar), 2.5Mpa(25bar)
3.Steam temperature output:184C,194C,204C,225C.
4.Suitale fuel: biomass, wood pellet,peanut, paddy, rice husk, solid fuel,etc
5.Structure: water tube, big cyclone room
6. Application:industrial production and processing.
II.Suitable fuels
Coal,Biomass, wood pellet,wood chips, peanut, paddy, rice husk,palm oil shell,solid fuel,etc
The size of some most common biomass fuel:
(1).Biomass/wood pellets:≤Φ10×30 mm
(2).Wood chips:≤100×50×50 mm
(3).Sawdust:≤20×20×10 mm
(4).Coal
III. Boiler advantages
IV. Technical datasheet
Boiler model | Rated capacity |
Rated pressure
|
Rated steam temp.
|
Feed water temp. | Exhaust gas temp. | Design effiency | Boiler water volume | Weight | Dimension | Delivery mode |
ton/h | Mpa | ℃ | m2 | ℃ | % | m3 | ton | mm | ||
SZL2 | 2 |
1.25/1.6/ 2.5/3.82 |
194/204/ 226/450 |
20/105 | 130.67 | 83.13 | 6.76 | 22 | 5900×2850×3460 | Package |
SZL4 | 4 | 142 | 84.23 | 5.1 | 29 | 6460×3280×3462 | Package | |||
SZL6 | 6 | 142 | 84.81 | 8.4 | 34 | 7830×3560×3462 | Package | |||
SZL8 | 8 | 149.15 | 85.02 | 9.4 | 40.5 | 8870×3670×3462 | Package | |||
SZL10 | 10 | 152.7 | 86.2 | 8.35 | 24 | 7645×3180×3526 | Assembly | |||
SZL12 | 12 | 148.7 | 86.56 | 12.8 | 37 | 9258×3294×3524 | Assembly | |||
SZL15 | 15 | 149.86 | 86.29 | 15.5 | 24.7 | 11010×3300×2200 | Assembly | |||
SZL20 | 20 | 147.4 | 86.8 | 15.8 | 25.97 | 16680×6200×8420 | Assembly | |||
Notice: 1.special proposal is available according to different place's different encironmental requirements; 2. burning fuel's heat value/chemincal component different, parameter different; 3.Since the boiler technology is keep updating, if there is any update in the future, no special imform. |
1. Nude packaging for boiler mian part and wood box packaging for boiler accessories.
2.Normally we use 20 container, 40container or 20 flat rack container and 40 flat rack container to load it.
3.All goods will be reforced after packing into containers.
4. We have stable shipping company to cooperate. They will confirm the safty of the goods.
5. Shipping way is different according to customer's country. Mostly by sea. Some country by train.
Pre-sale service:
We help customer choose the best boiler model according to different requirements of various industry. Before delivery we will provide foundation drawing, layout drawing, boiler room layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the production process to ensure on time delivery with perfect finished product.
After-sale service:
1.provide full range of original spare parts.
2.Engineers abroad installation and commissioning service is available.
3.Our engineers will held a training for boiler workers to ensure the safe operation.
4.Free maintenance and repair for one year and lifelong service.