- Product Details
- {{item.text}}
Quick Details
-
Oiled or Non-oiled:
-
Non-oiled
-
Invoicing:
-
by actual weight
-
Place of Origin:
-
Tianjin, China
-
Brand Name:
-
JZ
-
Outer Diameter:
-
1 - 150 mm
-
Thickness:
-
4-20mm
-
Grade:
-
4130
-
Product name:
-
Seamless Carbon Steel Pipe
-
Material:
-
ASTM/AISI/SGCC/CGCC/TDC51DZM/TDC52DTS350GD/TS550GD/DX51D+Z Q195-q345
-
Keyword:
-
Carbon Seamless Tubes
-
Usage:
-
Oil Gas Sewage Transport
-
Surface:
-
Customers't Requirement
-
MOQ:
-
5 Tons
-
Payment terms:
-
30%TT Advance + 70% Balance
-
Packing:
-
Standard Seaworthy Packing
-
Sample:
-
Sample Freely
Quick Details
-
Section Shape:
-
Round
-
Surface Treatment:
-
Hot Rolled Cold Rolled
-
Tolerance:
-
±5%
-
Oiled or Non-oiled:
-
Non-oiled
-
Invoicing:
-
by actual weight
-
Place of Origin:
-
Tianjin, China
-
Brand Name:
-
JZ
-
Outer Diameter:
-
1 - 150 mm
-
Thickness:
-
4-20mm
-
Grade:
-
4130
-
Product name:
-
Seamless Carbon Steel Pipe
-
Material:
-
ASTM/AISI/SGCC/CGCC/TDC51DZM/TDC52DTS350GD/TS550GD/DX51D+Z Q195-q345
-
Keyword:
-
Carbon Seamless Tubes
-
Usage:
-
Oil Gas Sewage Transport
-
Surface:
-
Customers't Requirement
-
MOQ:
-
5 Tons
-
Payment terms:
-
30%TT Advance + 70% Balance
-
Packing:
-
Standard Seaworthy Packing
-
Sample:
-
Sample Freely
Products Description
item
|
value
|
Place of Origin
|
China
|
|
Tianjin
|
Application
|
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe
|
Alloy Or Not
|
Non-Alloy
|
Section Shape
|
Round
|
|
|
Special Pipe
|
API Pipe
|
Standard
|
JIS
|
Certificate
|
API, ce, Bsi, RoHS, SNI, BIS, SASO, PVOC, SONCAP, SABS, sirm, tisi, KS, JIS, GS, ISO9001
|
Grade
|
4130
|
Surface Treatment
|
Cold Rolled
|
Tolerance
|
±5%
|
Processing Service
|
Welding, Punching, Cutting, Bending, Decoiling
|
Oiled or Non-oiled
|
Non-oiled
|
Invoicing
|
by actual weight
|
Delivery Time
|
8-14 days
|
Application
|
Fluid Pipe
|
Surface Treatment
|
Hot Rolled Cold Rolled
|
Product name
|
Hot Rolled Seamless Pipes
|
Section Shape
|
Round
|
Material
|
ST52
|
Type
|
Seamless Round Steel Pipe
|
Keyword
|
Mill Test Certificate Steel Pipe
|
Usage
|
Oil Gas Sewage Transport
|
Shape
|
Round Pipe Tube
|
Surface
|
Bright
|
Factory Video
Details Images
F&Q
Q1: What's your terms of payment?
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF
Q3: What's the terms of packing?
A: Generally,we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 7 work days after we received the deposit.For productionperiod,
it usually takes about 15 days to 30 days after we received the deposit.
Q5: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.
Q6: Could youprovide the compliment samples?
A: Yes, we could provide the free samples on condition that it is available in stocks, however,the transportation fee is borne by
buyer.
Q7: How could you guarantee your products quality?
A: Each piece of products is manufactured by certified workshops, inspected by us piece by piece according to national QA/QC
standard. We also could issue the warranty to customer to guarantee the quality.
Q8:What are the advantages of your company?
A:(1): Prime quality and reasonable price.
(2): Wide excellent experiences with after-sale service.
(3): Every process will be checked by responsible QC which insures every product's quality.
(4): Professional packing teams which keep every packing safely.
(5): Trial order can be done in one week.
(6): Samples can be provided as your requirements.
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF
Q3: What's the terms of packing?
A: Generally,we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 7 work days after we received the deposit.For productionperiod,
it usually takes about 15 days to 30 days after we received the deposit.
Q5: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.
Q6: Could youprovide the compliment samples?
A: Yes, we could provide the free samples on condition that it is available in stocks, however,the transportation fee is borne by
buyer.
Q7: How could you guarantee your products quality?
A: Each piece of products is manufactured by certified workshops, inspected by us piece by piece according to national QA/QC
standard. We also could issue the warranty to customer to guarantee the quality.
Q8:What are the advantages of your company?
A:(1): Prime quality and reasonable price.
(2): Wide excellent experiences with after-sale service.
(3): Every process will be checked by responsible QC which insures every product's quality.
(4): Professional packing teams which keep every packing safely.
(5): Trial order can be done in one week.
(6): Samples can be provided as your requirements.
Hot Searches