- Product Details
- {{item.text}}
Quick Details
-
Machinery Capacity:
-
50-600L
-
Machinery Function:
-
Mixing and cooking
-
Function:
-
Boiling and mixing
-
Application:
-
Porridges, soups, dumplings, cooking and stew with vegetables.
-
Keywords:
-
Jacketed Kettle
-
Material:
-
Stainless Steel 304
-
Heating way:
-
Electric or steam or oil
-
Capacity:
-
can be customize
-
Voltage:
-
220V/230V/380V/415V/440V
-
Rotate speed:
-
1-100RPM
-
Main structure:
-
Pot body, heating system, tilting system.legs
Quick Details
-
Weight (KG):
-
615
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Innovaster
-
Machinery Capacity:
-
50-600L
-
Machinery Function:
-
Mixing and cooking
-
Function:
-
Boiling and mixing
-
Application:
-
Porridges, soups, dumplings, cooking and stew with vegetables.
-
Keywords:
-
Jacketed Kettle
-
Material:
-
Stainless Steel 304
-
Heating way:
-
Electric or steam or oil
-
Capacity:
-
can be customize
-
Voltage:
-
220V/230V/380V/415V/440V
-
Rotate speed:
-
1-100RPM
-
Main structure:
-
Pot body, heating system, tilting system.legs
Product Description
Steam Cooker Machine Lotus Jujube Paste Curry Cooking Jacketed Kettle with agitator
|
|
|
|
|
FAQ
Q: What methods of payment are acceptable?
A: FOB, CFR & CIF optional; It’s mainly depend on client’s requirement; Accepted payment types: T/T, L/C;
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production; Always make a final inspection and trial running before delivery;
Q: What’s the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule the timing
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.
Contact Us
Hot Searches