- Product Details
- {{item.text}}
Quick Details
-
Application:
-
any constructions
-
Design Style:
-
as clients request
-
Type:
-
Shoring Prop System
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
Jincheng
-
Model Number:
-
ShoringProp021
-
Surface treatment:
-
Hot dip galvanized, powder coated, dip painted
-
Lifespan:
-
30 Years
-
Material:
-
Q235/Q345 Steel
-
Certificate:
-
SGS, TUV, CE, ISO
-
Packing:
-
Packed into bundle, and rest in bulk.
-
MOQ:
-
One full container
-
Thickness:
-
2.75/3.0/3.2mm
-
Technique:
-
CO2 Arc Welding Scoffolding
-
Color:
-
Silver or as clients'request
-
Diameter:
-
48.3-48.6mm
Quick Details
-
Warranty:
-
More than 5 years
-
After-sale Service:
-
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement, Other
-
Project Solution Capability:
-
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation, Others
-
Application:
-
any constructions
-
Design Style:
-
as clients request
-
Type:
-
Shoring Prop System
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
Jincheng
-
Model Number:
-
ShoringProp021
-
Surface treatment:
-
Hot dip galvanized, powder coated, dip painted
-
Lifespan:
-
30 Years
-
Material:
-
Q235/Q345 Steel
-
Certificate:
-
SGS, TUV, CE, ISO
-
Packing:
-
Packed into bundle, and rest in bulk.
-
MOQ:
-
One full container
-
Thickness:
-
2.75/3.0/3.2mm
-
Technique:
-
CO2 Arc Welding Scoffolding
-
Color:
-
Silver or as clients'request
-
Diameter:
-
48.3-48.6mm
Scaffolding Hot Dipped Galvanized Formwork Steel Acro Jacks Props Steel Prop / Prop Jack Support / Adjustable Shoring Posts
Place of origin | Chuzhou, China | |||
Brand | Jincheng | |||
Type | Heavy duty or Light duty | |||
Color | Red/Orange/Blue/ Green or as costomers requirements | |||
Main Materials | Q235/Q345 | |||
Wall thickness | 1.4-4.0mm | |||
Size | Inner tube diameter(mm) | Outer tube diameter(mm) | Adjustable length(mm) | Wall Thickness(mm) |
more customized size available | 48 | 56/60 | 800-1250 | 1.4-4.0 |
1250-1700 | ||||
1550-2500 | ||||
2200-3500 | ||||
2500-3950 | ||||
2200-4000 | ||||
Technique | ERW(Electric Resistance Welding) | |||
Surface Treatment | Galvanized/painted/powder costed | |||
Aplication | Constrution Building | |||
Certificate | SGS | |||
MOQ | 100 pcs | |||
Type of plate | Flower/Square/U-head Plate | |||
Type of nut | Wing nut/Cup nut | |||
Type of pin | Line pin/G pin/Wire pin | |||
Package | Packed in bulk or in bundle | |||
Main markets | MIddle East, Southeast Asia and all over the world | |||
Production Capacity | 100000pcs/month |
More Informations
1. A complete set of steel prop consists of top plate,base plate,inner pipe,outer pipe, sleeve,nut and pin.
2.The steel prop is easy to assemble and disassemble due to its simple structure.
3. Can be adjusted to any length within its range;it can be reused.
4. Widely used in proping system such as construction,plants and bridge etc.
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status
4. Question: What's your delivery time?
Answer: 20-35 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for 17 years.
6. Question: Where's your factory?
Answer: Our factory is in Chuzhou city (near Nanjing) Anhui Province, afforded
enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional
sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (Cuplock&Ring lock&Kwikstage system, frame, coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair/ladder case