- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
sdxz
-
Model Number:
-
steel rebar
-
Application:
-
construction,building
-
Product name:
-
Deformed Steel Bar
-
Type:
-
Carbon Structural Steel
-
MOQ:
-
3T
-
Shape:
-
Coil Straight U-shape
-
Material:
-
Reinforcement Ribbed Steel Bar
-
Technique:
-
Hot Rolled Steel Rebar
-
Commodity:
-
Standard Rebar Specification Rebar Steel
-
Keyword:
-
Reinforcing Rebar Iron
-
Surface:
-
Black
-
Main Application:
-
Buliding Bridge House Decoration
Quick Details
-
Grade:
-
HRB400
-
Length:
-
6/9/12m
-
Tolerance:
-
±1%
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
sdxz
-
Model Number:
-
steel rebar
-
Application:
-
construction,building
-
Product name:
-
Deformed Steel Bar
-
Type:
-
Carbon Structural Steel
-
MOQ:
-
3T
-
Shape:
-
Coil Straight U-shape
-
Material:
-
Reinforcement Ribbed Steel Bar
-
Technique:
-
Hot Rolled Steel Rebar
-
Commodity:
-
Standard Rebar Specification Rebar Steel
-
Keyword:
-
Reinforcing Rebar Iron
-
Surface:
-
Black
-
Main Application:
-
Buliding Bridge House Decoration
Keywords
|
Reinforcing Rebar Iron
|
Diameter
|
8-40mm
|
Grade
|
HRB300 HRB400 HRB500
|
Application
|
Building,construction
|
The Theoretic weight per size
Dia(mm)
|
Theoretic weight kg/m
|
Dia(mm)
|
Theoretic weight kg/m
|
8
|
0.395
|
19
|
2.23
|
9
|
0.499
|
20
|
2.47
|
10
|
0.617
|
21
|
2.72
|
11
|
0.746
|
22
|
2.98
|
12
|
0.888
|
23
|
3.26
|
13
|
1.04
|
24
|
3.55
|
14
|
1.21
|
25
|
3.85
|
15
|
1.39
|
28
|
4.83
|
16
|
1.58
|
32
|
6.31
|
17
|
1.78
|
36
|
7.99
|
18
|
2.00
|
40
|
9.87
|
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials,usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials,usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
Hot Searches