- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
Rima
-
Weight:
-
350 kg, without hitch: 350kg(770lbs) with hitch: 390kg(860lbs)
-
Dimension(L*W*H):
-
656x500mm(25.8"x20")
-
Model:
-
PD40S/E
-
Machine:
-
Skid steer loader/Excavator
-
Impulse force:
-
4000kg(8800lbs)
-
Frequency:
-
2000cpm
-
Hydraulic oil flow:
-
45-85L/min(12-22GPM)
-
Working pressure:
-
18Mpa(2610psi)
-
Post size(2pcs):
-
50,100,150,200mm (2",4", 6",8")
-
Base plate size:
-
656x500mm(25.8"x20")
-
Certification:
-
CE
Quick Details
-
Efficiency:
-
High Efficiency
-
Piling Speed(m/min):
-
3-6m/min
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Rima
-
Weight:
-
350 kg, without hitch: 350kg(770lbs) with hitch: 390kg(860lbs)
-
Dimension(L*W*H):
-
656x500mm(25.8"x20")
-
Model:
-
PD40S/E
-
Machine:
-
Skid steer loader/Excavator
-
Impulse force:
-
4000kg(8800lbs)
-
Frequency:
-
2000cpm
-
Hydraulic oil flow:
-
45-85L/min(12-22GPM)
-
Working pressure:
-
18Mpa(2610psi)
-
Post size(2pcs):
-
50,100,150,200mm (2",4", 6",8")
-
Base plate size:
-
656x500mm(25.8"x20")
-
Certification:
-
CE
Product Overview
Hydraulic Fence Post Driver
Hydraulic pile driver is using its high frequency vibration to vibrate pile body with high acceleration to pass the vertical
vibration of mechanical produce to pile which leading to changes in the soil structure around the pile, strength decrease. Soil
around the piles become liquefaction to reduce frictional resistance between side of the pile and the soil. Then using the
excavator down force, vibrating pile hammer and pile body weight to sink pile into the soil. When extracting piles, in the
condition of vibration to pull out the pile by using excavator lift force. Excitation force needed by pile driving machinery are
comprehensive determined by site soil, soil condition, moisture content and type of pile, construction.
vibration of mechanical produce to pile which leading to changes in the soil structure around the pile, strength decrease. Soil
around the piles become liquefaction to reduce frictional resistance between side of the pile and the soil. Then using the
excavator down force, vibrating pile hammer and pile body weight to sink pile into the soil. When extracting piles, in the
condition of vibration to pull out the pile by using excavator lift force. Excitation force needed by pile driving machinery are
comprehensive determined by site soil, soil condition, moisture content and type of pile, construction.
PRODUCT SPECIFICATIONS
Model
|
PD40S
|
PD40E
|
Machine
|
Skid steer loader
(Min.45L/min/ 12GPM)
|
Excavator
(5-12ton/11000-26500lbs)
|
Impulse force
|
4000kg(8800lbs)
|
4000kg(8800lbs)
|
Frequency
|
2000cpm
|
2000cpm
|
Hydraulic oil flow
|
45-85L/min(12-22GPM)
|
45-85L/min(12-22GPM)
|
Working pressure
|
18Mpa(2610psi)
|
18Mpa(2610psi)
|
Post size(2pcs)
|
50,100,150,200mm
(2”,4”, 6”,8”)
|
50,100,150,200mm
(2”,4”, 6”,8”)
|
Base plate size
|
656x500mm(25.8”x20”)
|
656x500mm(25.8”x20”)
|
Weight
|
without hitch: 350kg(770lbs)
with hitch: 390kg(860lbs)
|
without hitch: 350kg(770lbs)
with hitch: 390kg(860lbs)
|
PRODUCT CONFIGURATION
Fitting attachment for skid loader
Quick coupling
apply for solar tube piles
Motor Adptor to fit digger Chain
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Hot Searches