Products
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine
High quality air conditioner aluminum copper fin punching press machine

High quality air conditioner aluminum copper fin punching press machine

FOB Reference Price: Get Latest Price
≥1 Sets
US $19800
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

After-sales Service Provided:
Online Support
Product name:
FIN
Keyword:
fin press machine
Color:
Customer's Requirement
Advantage:
High Effciency
Control system:
PLC+touch Screen
Delivery time:
20~30 Days
Power:
13.5kw

Quick Details

Place of Origin:
Jiangsu, China
Brand Name:
BOBO
Weight (KG):
1300
After-sales Service Provided:
Online Support
Product name:
FIN
Keyword:
fin press machine
Color:
Customer's Requirement
Advantage:
High Effciency
Control system:
PLC+touch Screen
Delivery time:
20~30 Days
Power:
13.5kw
HIGH SPEED FIN PRESS MACHINE This machine by the high-speed precision punching, feeding device, material over the oil lubrication device, quick mold change device, pulling device (single and double jump), suction device, aggregate device, waste collection device, Electrical system, pneumatic system.
Punching times
120-200
Dies height
252.5-302.5mm
Dies moving height
80mm
Slider Strok dimension
850×730mm
Deep throat
600mm
Working plate
580×860
Main power
5.5kw
Total power
13.5 kw
voltage
AC380V,50HZ,3Pahse
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.

2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc

3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other
payment term, like L/C, DA, D/P etc

4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.

5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.
APP
Post My RFQ
WhatsApp
+86-17326049340