1. Normal 7 seconds to finish one circle . including the time of the operator to put and take out
2. Production yield is about 81600 pcs per day as working time in 8 hours .
One minute can finish about 8.5 sheets,
one sheet is 20 pcs .
The production yield of one minute is about 170 pcs
3. the power of mold heating is ≤600W.
General mold can do a variety of specifications:
Normal Length of Sponge Swab
80mm
100mm
150mm