- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
zhongmei
-
Motor Power:
-
4HP
-
Charging Capacity:
-
6-10m3/h
-
Reclaiming capacity:
-
6-10m3/h
-
Speed of Mixing Drum:
-
30r/min
-
Water Supply Mode:
-
Water evaporative
-
Working Cycle Period:
-
12h
-
Discharge Way:
-
Electric
-
Outline Dimension:
-
1700* 970*1600mm
-
Weight (KG):
-
300 kg
-
ki:
-
Concrete Pump
-
k2:
-
Cement Concrete Pumps
-
k3:
-
Mini Cement Concrete Pumps
-
k4:
-
Concrete Pump Truck
Quick Details
-
Mixing Power:
-
30r/min
-
Productivity:
-
15M³/H
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
zhongmei
-
Motor Power:
-
4HP
-
Charging Capacity:
-
6-10m3/h
-
Reclaiming capacity:
-
6-10m3/h
-
Speed of Mixing Drum:
-
30r/min
-
Water Supply Mode:
-
Water evaporative
-
Working Cycle Period:
-
12h
-
Discharge Way:
-
Electric
-
Outline Dimension:
-
1700* 970*1600mm
-
Weight (KG):
-
300 kg
-
ki:
-
Concrete Pump
-
k2:
-
Cement Concrete Pumps
-
k3:
-
Mini Cement Concrete Pumps
-
k4:
-
Concrete Pump Truck
Product Paramenters
Maximum Theoretical Concrete Delivery Volume
|
15m³/h
|
Maximum Pumping Concrete Pressure
|
10MPa
|
Distribution Valve Form
|
S-pipe valve
|
Concrete Conveying Cylinder Bore*Stroke
|
Φ140*650mm
|
Outlet Diameter
|
Φ100mm
|
Rated Power
|
30.1KW
|
Rated Speed
|
1280r/min
|
Hydraulic Circuit Form
|
open circuit
|
Pumping Xiyong Oil Pressure
|
18MPa
|
Oil Pressure Of Stirring System
|
8MPa
|
Hydraulic Tank Volume
|
200L
|
Maximum Conveying Vertical Distance
|
120m
|
Maximum Conveying Horizontal Distance
|
250m
|
Maximum Particles Allowed
|
30mm
|
Dimensions L*W/*H
|
3400*1100*1700mm
|
Total Mass
|
1500KG
|
Details Images
Products Description
Portable Mini Cement Concrete Pumps Concrete Pump Truck Price Truck Mounted Pump For Sale
(1) The particle size of sand and gravel, the grade of cement and the mixing ratio should meet the requirements of the mechanical performance of the pump according to the requirements of the factory manual.
(2) The parking brake and locking brake of the pumping equipment should be used at the same time, the tires should be wedged tightly, the water supply should be normal, the water tank should be filled with clean water, there should be no debris in the hopper, and each lubrication point should be lubricated normally.
(3) All bolts of pumping equipment should be tightened, pipe joints should be tightened and sealed, and protective devices should be complete and reliable.
(4) At the beginning of each part of the operation, the adjustment handle, handwheel, control rod, cock, etc. should be in the correct position. The hydraulic system should be normal and leak-free.
(5) Prepare cleaning pipes, cleaning supplies and other related devices. Before the operation, the pipeline must be lubricated with cement mortar prepared according to the regulations. Unrelated personnel must leave the pipeline. (6) The outriggers should be fully extended and supported firmly, and the boom should not be started before they are fixed. The boom can only be rotated after the support is raised. When the boom is extended, it should be done in sequence. It is strictly forbidden to use the boom to lift or drag objects.
(7) When the boom is fully extended, it is strictly forbidden to move the body. When it is necessary to move during the operation, the upper boom should be folded and fixed, and the moving speed should not exceed 10km/h. The placing boom shall not use pipes with a diameter exceeding the specified diameter, and the connected wheel pipes shall be tied with anti-fall safety ropes.
(8) Various instruments and indicator lights should be monitored at any time, and if abnormality is found, adjust or deal with them in time. If the conveying pipe is blocked, the concrete should be transported in reverse direction to return the concrete to the hopper. If necessary, the pipe should be dismantled to remove the blockage. .zmwm14
(9) When the pumping system is under pressure, do not open any delivery pipelines and hydraulic pipelines. The safety valve of the hydraulic system shall not be adjusted arbitrarily. The accumulator can only be charged with ammonia gas.
(10) After the operation, all the concrete in the hopper and pipeline must be output, and then the pump, hopper and pipeline must be cleaned. When flushing the pipeline with compressed air, no one should stand within 10m in front of the outlet end of the pipeline, and use a metal mesh basket to collect the foam rubber and sand and gravel particles flushed out.
(11) It is strictly forbidden to use compressed air to flush the piping of the boom. The folding and shrinking of the boom must be carried out in sequence.
(12) All parts of the control switch, adjustment handle, hand wheel, control sweat, cock, etc. should be reset. Hydraulic system unloading.
Why Choose Us
Hot Searches