Products
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J
Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J

Public Park or Garden body building keep fit outdoor fitness equipment JMQ-G183J

FOB Reference Price: Get Latest Price
≥2 Sets
US $260
≥5 Sets
US $250
≥20 Sets
US $220
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Name:
fitness equipment
Colour:
green,yellow,blue,red
Size:
113*55*144 cm
MOQ:
1 set
OEM:
Offered
Workmanship:
Perfect
Usage:
Gymnastics, park
certificate:
CE, EN1176, ISO, ROHS,ect
Feature:
Eco-friendly, durable, weather resistance
Delivery time:
15 -20 Days

Quick Details

Place of Origin:
Guangdong, China
Brand Name:
Gmich
Model Number:
JMQ-G183J
Name:
fitness equipment
Colour:
green,yellow,blue,red
Size:
113*55*144 cm
MOQ:
1 set
OEM:
Offered
Workmanship:
Perfect
Usage:
Gymnastics, park
certificate:
CE, EN1176, ISO, ROHS,ect
Feature:
Eco-friendly, durable, weather resistance
Delivery time:
15 -20 Days
Specification
Size
113*55*144cm
Advantage
1.Anti-UV 2.Anti-static 3.Safe 4.Environmental protection 5.Color not easy to fade
Material
1. Plastic part: LLDPE, rotational mould, anti-UV, anti-static, anti-crack. 2. Metal: National standard steel pipe, welded by the
industrial robot, strong and smooth. 3. Deck: use the automatic bunching machines, skid-proof, water- proof
Delivery date
15 DAYS
Certificate
ISO9001, CE, TUV, ROHS, EN1176
Product Description
Production process

step 1

Ironwork production
(1) Galvanized pipe : cut by electric welding process, the column is made of 114mm diameter international steel pipe, thickness 2mm , the whole processed by a special process of rust removal, oil removal and sand blasting, and then baked with outdoor polyester system (polyester/TGIC system) resin powder coating high temperature curing, fine polishing, to avoid the existence of burr sharp corners, polishing to make the surface smoot (2) Platform production , cutting thickness of 1.2mm, high-strength cold-rolled steel plate punching, and then anti-slip plastic coating, resin baking paint, grinding and polishing (3) The hardware is cut by water-grinding to ensure a neat and smooth cut; the bending machine bends the welded pipe and forms it by welding to meet the design requirements.

step 2

Spray sanding
Powder coating high temperature baking paint, using hih pressure electrostatic spraying process ,polished to a smooth and corrosion resistant material.

step 3

Rotomoulding area
LLDPE plastic material , high temperature plastic film, with anti-static factor and anti-UV factor, with anti-UV, anti-static and high temperature resistance

step 4

Packing of goods
black core cotton and PP thermoplastic film packed , marked on the outside with a woven bag, put on the packing list,installation drawings.

step 5

Shipments
The products will be packed by our professional packers to ensure reasonable stacking,safe transportation and no damage to the products .
Customer visit
Our Advantages
Contact me





We provide one stop solutions of children's commerical playgrounds from design,manufacture and install.
Related Products
Certifications
APP
Post My RFQ
WhatsApp
+86-17326049340