- Product Details
- {{item.text}}
Quick Details
-
Bottle Volume(ml):
-
2000 ml
-
Place of Origin:
-
China
-
Year:
-
New
-
Voltage:
-
Acoording customer country
-
Dimension(L*W*H):
-
1900*1800*1930mm
-
Weight (KG):
-
2500 KG
-
Name:
-
2 Cavities PET Blowing Machine Semi Automatic For Plastic Drink Bottle
-
Theoretical Output:
-
1000BPH
-
Cavity:
-
2 cavity
-
Volume:
-
0.1-1.5L Bottle
-
Mold Material:
-
45#steel
-
Cylinder:
-
FESTO Brand (GERMANY)
-
Suitable bottles:
-
oil bottle/mineral water bottle/cosmetics bottle
-
Key words:
-
PET Blowing Machine Semi Automatic For Plastic Drink Bottle
-
Bottle design:
-
FREE bottle design
-
Other Service:
-
24hour online service
Quick Details
-
Neck Diameter(mm):
-
38 mm
-
Max.Bottle Diameter(mm):
-
110 mm
-
Max.Bottle Height(mm):
-
365 mm
-
Bottle Volume(ml):
-
2000 ml
-
Place of Origin:
-
China
-
Year:
-
New
-
Voltage:
-
Acoording customer country
-
Dimension(L*W*H):
-
1900*1800*1930mm
-
Weight (KG):
-
2500 KG
-
Name:
-
2 Cavities PET Blowing Machine Semi Automatic For Plastic Drink Bottle
-
Theoretical Output:
-
1000BPH
-
Cavity:
-
2 cavity
-
Volume:
-
0.1-1.5L Bottle
-
Mold Material:
-
45#steel
-
Cylinder:
-
FESTO Brand (GERMANY)
-
Suitable bottles:
-
oil bottle/mineral water bottle/cosmetics bottle
-
Key words:
-
PET Blowing Machine Semi Automatic For Plastic Drink Bottle
-
Bottle design:
-
FREE bottle design
-
Other Service:
-
24hour online service


Auxiliary Equipment
1.
Air Compressor
: Compress air,used for blowing bottle and blower action. ( Pressure 3.0Mpa )
2.
Air Tank
: Store high pressure air.
3.
Air Filter
: Including 1 set T-class filter (1um) and 1 set A-class filter (0.01um). Cleaning oil and dust.
4.
Air Dryer
: Cooling and dry air,improve bottle quality,prolong phnuematic parts life.
5.
Chiller
: Cooling mould,make the machine suitable to working 24 hour per day.
1. Air Compressor : Compress air,used for blowing bottle and blower action. ( Pressure 3.0Mpa )
3. Air Filter : Including 1 set T-class filter (1um) and 1 set A-class filter (0.01um). Cleaning oil and dust.
4. Air Dryer : Cooling and dry air,improve bottle quality,prolong phnuematic parts life.
5. Chiller : Cooling mould,make the machine suitable to working 24 hour per day.
1.Semi automatic running with theoretical output :
-400-500BPH for 3L-5L bottle.
-800-1000BPH for 50ml-2.5L bottle. (Need extra components)
2.Advanced PLC control system with use-friendly touch screen.
3.Simple installation & start up operation.
4.Adopting double crank to adjust mould ,heavy locking mould, stable and fast.
5.Preforms are rotating in the heater to ensure being heated evenly.
6.Equipped with air cooling system ensure the bottle neck not deform.
7.Equipped with special designed air storage unit.
8.The machine surface is treated with baking varnish.
-400-500BPH for 3L-5L bottle.
-800-1000BPH for 50ml-2.5L bottle. (Need extra components)
2.Advanced PLC control system with use-friendly touch screen.
3.Simple installation & start up operation.
4.Adopting double crank to adjust mould ,heavy locking mould, stable and fast.
5.Preforms are rotating in the heater to ensure being heated evenly.
6.Equipped with air cooling system ensure the bottle neck not deform.
7.Equipped with special designed air storage unit.
8.The machine surface is treated with baking varnish.

In order to be safety during transport,all the equipment should be packaged by PE film and wooden case
YOU ARE WELCOME TO OUR FACTORY AT ANY TIME
.
● If we can fullfill your request and you interested in our products, you may pay a visit to ZHENGGE Machine site.
● The meaning of visiting supplier, because seeing is believing, ZHENGGE Machine with own manufacture and developed& research team,we can send you engineers and make sure your after sales service.
HOW TO GUARANTEE YOUR FUNDS TO BE SAFE AND DELIVERY TO BE ON TIME?
● Through Alibaba letter guarantee service, it will ensure the on time delivery and the quality of the equipment you want to buy.
● By letter of credit, you can lock the delivery time easily.
● After the factory visit, You can ensure the facticity of our bank account.
SEE ZHENGGE MACHINE HOW TO ENSURE THE QUALITY!
● In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
● Each component before assembly needs strictly control by inspecting personnel.
● Each assembly is in charged by a master who has working experience for more than 5 years.
●After all the equipment are completed, we will connect all the machines and run the full production line for at least 12 hours to ensure the stable running in customers' factory.
THE AFTER-SALE SERVICE OF ZHENGGE MACHINE!
● After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools.
● After the commissioning, we will package the equipment by standard export package for shipment.
● According to the customer's request, we can arrange our engineers to customers' factory to do the installation and training.
● Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the
customers' project.
● The meaning of visiting supplier, because seeing is believing, ZHENGGE Machine with own manufacture and developed& research team,we can send you engineers and make sure your after sales service.
HOW TO GUARANTEE YOUR FUNDS TO BE SAFE AND DELIVERY TO BE ON TIME?
● Through Alibaba letter guarantee service, it will ensure the on time delivery and the quality of the equipment you want to buy.
● By letter of credit, you can lock the delivery time easily.
● After the factory visit, You can ensure the facticity of our bank account.
SEE ZHENGGE MACHINE HOW TO ENSURE THE QUALITY!
● In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
● Each component before assembly needs strictly control by inspecting personnel.
● Each assembly is in charged by a master who has working experience for more than 5 years.
●After all the equipment are completed, we will connect all the machines and run the full production line for at least 12 hours to ensure the stable running in customers' factory.
THE AFTER-SALE SERVICE OF ZHENGGE MACHINE!
● After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools.
● After the commissioning, we will package the equipment by standard export package for shipment.
● According to the customer's request, we can arrange our engineers to customers' factory to do the installation and training.
● Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the
customers' project.
Hot Searches