- Product Details
- {{item.text}}
Quick Details
-
main body:
-
Aluminum alloy
-
pillar:
-
120*120*1.8mm
-
beam:
-
160*120*1.9mm
-
Louver:
-
188*40*1.4mm
-
Hardware Accessories:
-
stainless steel
-
Delivery time:
-
15-35 days
-
LED lighting system circle:
-
Full installation of light guide strips (21 strips)
-
Four-sided roller blinds optional:
-
Electric lifting, remote control.
-
Sail Material:
-
Polycarbonate roof
-
Sail Finishing:
-
Frame with powder coating
Quick Details
-
Place of Origin:
-
Zhejiang, China
-
product name:
-
4*3 Aluminum Alloy Electric Moonlight Canopy
-
Size:
-
3970*2980*2500mm
-
main body:
-
Aluminum alloy
-
pillar:
-
120*120*1.8mm
-
beam:
-
160*120*1.9mm
-
Louver:
-
188*40*1.4mm
-
Hardware Accessories:
-
stainless steel
-
Delivery time:
-
15-35 days
-
LED lighting system circle:
-
Full installation of light guide strips (21 strips)
-
Four-sided roller blinds optional:
-
Electric lifting, remote control.
-
Sail Material:
-
Polycarbonate roof
-
Sail Finishing:
-
Frame with powder coating
Packaging details:Each product is packed in export cartons
Delivery time: 15-35 days
Port: Ningbo Port
Delivery time: 15-35 days
Port: Ningbo Port
Product name:
|
4*3 aluminum alloy electric moonlight awning
|
Frame Material:
|
Outdoor Furniture
|
Application:
|
Hotels/parks/gardens/villas
|
Product dimensions:
|
3970*2980*2500
|
Main aluminum alloy:
|
Column: 120*120*1.8; beam 160*120*1.9; louver 188*40*1.4;
Stainless steel hardware accessories;
|
LED lighting system circle:
|
Full installation of light guide strips (21 strips)
|
Four-sided roller shutter selection:
|
Electric lifting, remote control.
|
Products Description
1.Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
However customer has to pay for the product cost and shippingcost.
2.What about the delivery time?
A: Sample needs 5-10 days, mass production time needs 15-45 days for orders.
3. Do you offer guarantee for the products?
A: Yes, we offer 2 years warranty to our products.
4.How do you sove the complaint from customer?
A: Find the key point of complaint firstly,take steps to solve it.
If the mistake belong us,we will bear all losses.
Production Lead Time:
1.High Season(September to April): 35-60 days
2.Low Season( May to August) :around 15-35 days
3.We will come up with a detailed production schedule for
each order and this schedule will be a platform for onward
communication between customers and us."
Production Capacity:
1.5 production lines
2.Daily output of 200pcs furniture
3.Monthly output of 30 containers.
4. Yearly output of 80000pcs furniture and 400 containers
Payment Terms:
1.30% TT inadvance, 70% balance before delivery.
2. We can offer different pricing of FOB, CIF and C&F.
3. Cash, All Express Escrow, Paypal, West Union, Money Gram,
Bank Transfer and L/C are all available.
Hot Searches