Products
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine
Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine

Stainless steel Automatic Mango Apple Puree Extractor Electric Tomato Sauce making machine

FOB Reference Price: Get Latest Price
≥5 Pieces
US $145
≥10 Pieces
US $140
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Voltage:
110/ 220 V
Power:
450W
Weight:
10.9 KG
Dimension(L*W*H):
53*29.5*38.5mm
Year:
2023
Item:
Sauce macking machine
Item No.:
JM-1C
Capacity:
90-160KG/H
Function:
Make sauce
MOQ:
1 Set
N.W:
9.5kg
G.W:
11.1kg
Raw material:
Sainless Steel
Color:
Sliver
Usage:
Food Industry Equipment

Quick Details

Place of Origin:
Jiangsu, China
Brand Name:
Jinkun
Type:
JM-1C
Voltage:
110/ 220 V
Power:
450W
Weight:
10.9 KG
Dimension(L*W*H):
53*29.5*38.5mm
Year:
2023
Item:
Sauce macking machine
Item No.:
JM-1C
Capacity:
90-160KG/H
Function:
Make sauce
MOQ:
1 Set
N.W:
9.5kg
G.W:
11.1kg
Raw material:
Sainless Steel
Color:
Sliver
Usage:
Food Industry Equipment
1.What can you get from us?
Since we are direct manufactory for meat slicer, you can be assured that we can offer good quality with good price that is second to none when it comes to kitchen equipment. We believe that customer is the king and this is the principle that guides us in all our work ethics. We provide OEM ODM and customized design services.

2.How long is the delivery time?
Some of the products are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time 10~35 days depends on your requirement on the product. We will suggest you the fastest shipping method to you if you need the products urgently.

3.How long is the warranty time?
One year warranty for electrical parts.

4.What methods of payment are acceptable?
1) Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T Balance before shipment. 100% payment for sample orders.
2)Western Union: we accept 100% payment via the western union.
3)Letter of Credit (L/C): we accept 100% L/C irrevocable at sight.
APP
Post My RFQ
WhatsApp
+86-17326049340