- Product Details
- {{item.text}}
Quick Details
-
Use:
-
storage
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
HYD
-
Model Number:
-
HYD-FR
-
Depth:
-
1.0-3.5mm
-
Weight Capacity:
-
200-2000kg per pallet
-
Width:
-
customized
-
Height:
-
customized
-
Product name:
-
foldable steel truck tyre rack stillages storage shelves racking
-
Color:
-
RAL system
-
Certification:
-
ISO9001:2015
-
Loading Capacity:
-
100~2000kg
-
Structure:
-
Assembled Freely
-
Style:
-
Foldable
Quick Details
-
Type:
-
foldable rack
-
Material:
-
Steel
-
Feature:
-
Corrosion Protection
-
Use:
-
storage
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
HYD
-
Model Number:
-
HYD-FR
-
Depth:
-
1.0-3.5mm
-
Weight Capacity:
-
200-2000kg per pallet
-
Width:
-
customized
-
Height:
-
customized
-
Product name:
-
foldable steel truck tyre rack stillages storage shelves racking
-
Color:
-
RAL system
-
Certification:
-
ISO9001:2015
-
Loading Capacity:
-
100~2000kg
-
Structure:
-
Assembled Freely
-
Style:
-
Foldable
Tyre Rack ,
stacked storage of tires for heavy trucks, buses and farm machinery. Very popular in tire factory. It is equipped with four removable corner posts to reduce shipping costs and save space in the tire factory.
feature
|
2 entry way, anti-rust, powder coated
|
delivery
|
15 workdays after receiving the deposit
|
techniques
|
Automatically Stamping,Cold-press Shaping,CO2 protecting
|
size
|
customized
|
Our mother company Huade established in March 1993, is the pioneer in rack designing and production in China with regist capital of 13.62million dollars.
Yearly production: 60,000tons. Exporting percentage up to 50%, products accepted and popular in Japan, Europe and American.
Products comply to EN, ANSI, JIS, and FEM standard.
All the equipment self developed, engineered, manufacturered and installed. Delivery in time, quickly response.
The participant and constitutor of national standard for logistics.
The recommand brand by China Federation of Logistics & Purchasing(CFLP).
Beam Package
Upright Package
Container loading
1. Q: What's your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. .
2) Lead time: normally in 20-25 days after deposit received.
3) Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received.
4) Shipping port: Shanghai / Nanjing Port
2. Q: What is your service?
1) Your inquiry related to our products or price will be replied in 12 hours.
2) Well-trained and experienced staffs to answer all your inquiries in fluent English.
3) OEM & ODM, any your customized racking we can help you to design product.
4) We have very experienced professional engineers to make best solutions.
3. Q: Do you have any reference for assembling the products ?
Yes, we offer assembly manual and we can provide you instructor engineer to your warehouse if needed.
4. Q: What's the international trading process?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping.
5. Q: What's your advantage?
1) rush order we can fast delivery.
2) factory direct sale competitive price.
3) experienced professional engineers.
6. Q: How does charge tooling fee (cost of opening new mold)?
For the production of necessary tooling requirement, charges the cost before the first order for opening new mold, and the cost will be partially or fully refunded after certain quantity of orders.